![Fayat Group BOMAG BP 20/50 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/fayat-group/bomag-bp-20-50/bomag-bp-20-50_operating-instructions-manual_546912026.webp)
Operation
BOMAG
29
BP 20/50, BP 25/50
4.6
Switching the water sprin-
kling system
*
on/off
i
Note
Fill the water tank beforehand.
Fig. 27
l
Open or close the rotary button (Fig. 27) as re-
quired (continuously variable adjustment).
4.7
Switching the motor off
!
Caution
Do not shut the engine down all of the sudden
from full speed, but let it idle for a while for
temperature equalization.
Fig. 28
l
Move the throttle lever (Fig. 28) back to idle
speed position.
Fig. 29
l
Turn the ignition switch to position OFF (Fig.
29), the engine will stop.
*
Optional equipment
Go
to
Discount-Equipment.com
to
order
your
parts