![FAWNS Playtime PICUS Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/fawns/playtime-picus/playtime-picus_installation-instructions-manual_546847006.webp)
PAGE OF
2
2
Excavate the foundation hole in accordance to each products individual specification sheet. Each steel ground shoe is
supplied pre-attached to the unit post. Position the post into the foundation hole to the required depth.
NOTE:
As illustrated, it's essential a distance of 50mm is maintained from the finished surface level to the underside of the
timber post.
LOOSEFILL SURFACING
5
0
0
.0
3
0
0
.0
5
0
.0
M
IN
1
0
0
.0
7
4