![FAWNS Playtime PICUS Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/fawns/playtime-picus/playtime-picus_installation-instructions-manual_546847005.webp)
Woodcot Court, 2A Woodcot Gardens, Farnborough, Hampshire GU14 9RD Tel: 01252 515199 Fax: 01252 515858 http://www.fawns.co.uk Email:[email protected]
No part of this document may be copied or used without the express written permission of FAWNS RECREATIONAL SERVICES LTD (c) FRS 2014
3rd Angle
Projection
Date:
Drawn By:
Drawing Number:
Sheet:
Issue Date:
Sign:
Issue:
Code:
STEEL GROUND SHOE GENERAL INSTALLATION
207140
207140 ASSY
AK
OF
1
2
20/05/15
PAGE OF
1
1
A
20/05/15
AK
5
0
0
.0
1
0
0
.0
6
45.0°
R100.0
5
1
4
5
0
.0
M
IN
2
KEY
1. POST
2. STEEL GROUND SHOE
3. BOTTOM OF POST
4. FINISHED SURFACE LEVEL
5. TOP OF FOUNDATION
6. CONCRETE FOUNDATION
7. HARD STANDING
STEEL GROUND SHOE INSTALLATION
Excavate the foundation hole in accordance to each products individual specification sheet. Each steel ground shoe is
supplied pre-attached to the unit post. Position the post into the foundation hole to the required depth.
NOTE:
As illustrated, it's essential a distance of 50mm is maintained from the finished surface level to the underside of the
timber post.
3
GRASS/SYNTHETIC SURFACING