9
Pump System Test Procedures
Dry Run Spin Test
The FF-3D-TM-
TCP
is capable of Running Dry for extended periods of
ti
me, and it is best prac
ti
ce to perform
a
run dry test before using the pump. To perform this test, first double check that all hydraulic couplings
are fully
ti
ghtened, then connect the hydraulic system and run the FF 3D pump dry with varying speeds for
1-2 minutes. The pump has no internal fric
ti
on. At lower rpms the pump head can be leG running without
damage.
Pump should rotate counter-clockwise towards Discharge
HPU Start-Up Checklist
WARNING: These instruc ons may not apply to non-FFP Power Units or HPUs, please read all technical
literature associated with your power unit before running the system.
Always dry run spin test pump before placing pump into pit. Do not skip this test. That will leak test the
en re hydraulic system, verify impeller direc on, and func on test the hydraulic motor.
All hydraulic couplings must be fully ghtened. Use only screw together dripless hydraulic couplings.
Check hydraulic tank oil level
Check hydraulic filter and clear fluid color
Check engine oil and fuel levels
Leak check hydraulic hose and couplings for damage.
Inspect hydraulic lines for cuts, jacket abrasion.