manualshive.com logo in svg
background image

FAST & FLUID MANAGEMENT srl 

A Unit of Idex Corporation

 

 

 

 

 

 

 

 

 

 

Shaker SO-300 

 

 
 

 

 

 

 

USER MANUAL 

 

 

FAST & FLUID MANAGEMENT Srl 

A Unit of IDEX Corporation 

Via Pelizza da Volpedo, n° 109/111 

20092 Cinisello Balsamo (MI) 
ITALY 
Tel. 

: +39 02 66091.1 

Fax 

: +39 02 66091550 

Web 

: www.fast-fluid.com 

Содержание SO-300

Страница 1: ...nit of Idex Corporation Shaker SO 300 USER MANUAL FAST FLUID MANAGEMENT Srl A Unit of IDEX Corporation Via Pelizza da Volpedo n 109 111 20092 Cinisello Balsamo MI ITALY Tel 39 02 66091 1 Fax 39 02 660...

Страница 2: ...ARRANTY TERMS AND CONDITIONS 3 5 GENERAL DESCRIPTION 3 6 SAFETY RULES 3 7 RESIDUAL RISKS 5 8 INSTALLATION REQUIREMENTS 6 9 KEYBOARD 7 10 HOW TO OPERATE 7 11 LOADING THE CAN INTO THE MACHINE 8 12 ACOUS...

Страница 3: ...not give any allowance for reproducing or using this manual for other than installation use or maintenance No part of this manual can be reproduced translated or filed neither on computer in any form...

Страница 4: ...ts to the machine without written approval and or by unauthorized staff in case of incomplete maintenance or failure to observe the instructions contained in this manual The above conditions are appli...

Страница 5: ...SO300 tools after servicing 5 Make sure the environment in which the machine is installed complies with the laws in force you need to have an authorization issued by the Fire Brigade or by the compete...

Страница 6: ...tection protective glasses protective shoes protective gloves especially during the loading and unloading of the cans 7 4 General danger situations There is not any particular hazardous situation e g...

Страница 7: ...tal conditions must be within the following limits Air temperature 10 to 40 C Relative humidity 30 to 90 During the installation it is advisable to use protective gloves to avoid injuries Connect the...

Страница 8: ...T3 shaking cycle activated CLAMP OK Green Led ON Machine is clamping the can Button Stop Up Stop shaking open plate Reset after emergency stop Emergency button 10 HOW TO OPERATE 10 1 SWITCHING SO300 O...

Страница 9: ...efault Also these 3 parameters have been pre set in the testing phase in the factory in any case they can be modified by a technician through the Operator Panel according to the needs requirement of t...

Страница 10: ...sor activated Stand by No precaution Door closed 14 MAINTENANCE AND CLEANING During maintenance and check operations please wear protection gloves and unplug the machine These operations must be carri...

Страница 11: ...se any non abrasive cleaning product for domestic use on washable surfaces Control panel keyboard Use a wet cloth The use of neutral soap is allowed Then wipe no rinse with a dry cloth or a paper towe...

Страница 12: ...ttons T1 T2 T3 Before the shaking starts press Stop Up Open the door Unplug the machine from the mains Remove the grease and possible dried paint see paragraph 12 3 Then put some grease with a brush o...

Страница 13: ...anel board Uni directional AC motor drive Shaker motor Digital inputs Can sensors DC Solenoid drive Door solenoid Logic board Bi directional Pwm motor drive Clamp motor Digital inputs Upper limit swit...

Страница 14: ...1 P O Box 220 2170AE SASSENHEIM 1 01 Revnr Sheet Title Date Drawn Remarks Filename FAST FLUID MANAGEMENT Version RED GREEN 1 3 BROWN WHITE BROWN BLUE BROWN BLUE 1 2 BROWN WHITE 1 BLUE BROWN 20V GREY 0...

Страница 15: ...FAST FLUID MANAGEMENT srl A Unit of Idex Corporation 14...

Отзывы: