Fast & Fluid Management – SK350
V 2.0-2015
page 7
Step 3 - Detach shaker from its transport skid
>
Push the machine from
the pallet onto the ground
Push the machine to the final
location
For optimal mixing results and silent operation it is essential to
correctly level the machine and lock the adjustable feet.
Tip: before locking the adjustable feet, start a mixing cycle with a small
load (<5kg). While the SK350 runs, check if all four feet are firmly in
contact with the floor and then lock them.
Step 4 - Place the machine in its final operational position
>
>
Lower the adjustable
feet far enough to lift
the machine off its
wheels.
Take care to correctly
level the machine (by
turning the adjustable
feet).
Lock all adjustable feet by
tightening the their
separate bolts.
Содержание SK350
Страница 1: ...Fast Fluid Management SK350 V 2 0 2015 page 1 FAST FLUID MANAGEMENT SK350 ENGLISH...
Страница 17: ...Fast Fluid Management SK350 V 2 0 2015 page 17 Electrical wiring diagram...
Страница 19: ...Fast Fluid Management SK350 V 2 0 2015 page 19 Fast Fluid Management B V 2015 www Fast Fluid com...