a. Using thread tape, install 10-298 into ‘E’ port and the 10-299 into the
‘T’ port. Torque to 40 lb./ft.²
b. Attach PBR-1001 to back of system using the 3 or 6 spacers (depending
on spacing needed) and proper 1/4 - 20 ” bolts.
Torque to 10 lb./ft.²
c. Position system to mounting location.
System will mount below bed
on long beds and below the cab on short beds.
Mark these drill points
using the template on contents page
at least 1” from radial bend of
the frame in a staggered pattern (2 high and 2 low). The radial bend is
both the top and bottom of the frame.
Radial Bend
Marker
e. Insert DB-4646 into each return line fitting until you hear a click. Push down on locking tab. Secure fuel
line and wire harness with provided cable ties.
f. Clean and cap off the factory return ports with the two RVC-38 caps. Clean and cap off the factory suc-
tion/feed ports with the two RVC-12 caps. Seal factory electrical connections with di-electric grease or
similar to prevent corrosion.
Should look something like this.