
10
d. Disconnect the factory power plug to the HFCM lift pump. Clean plug and install the WE-1006 extension
connector. Plug female plug of the WH-1002 harness into pump. Reconnect the battery. Turn key on.
With pump operating, liberally spray WD-40 (or equivalent) into the “T” port. This process helps lubricate
the gear for easier initial priming.
c. Using thread tape, install the two 10-300 into the “T” & “E” ports.
Torque to 40 ft./lbs.
b.
Place a rubber spacer between the hanger bracket and bed rail and
the other rubber spacer on the opposite side between the bed rail and
NP-1001 nut plate.
Install the two ¼”-20 x 3 1/4” bolts, nuts and lock
washers and THB-1001.
a. Position system to mounting location, drivers side bed rail in front of the
axle.
The mounting bracket may be mounted on either side.
Use the
mounting template, located on the contents page, to accurately mark the
mounting location. Drill two ¼” holes.
RS-1002
Содержание FA F16 095G
Страница 6: ...7 Contents FL 1002 x8 WH 1002 BHB 1001 THB 1001 FF 3248 MP 9013...
Страница 15: ...16...