SYSTEM AIR PURGE PROCEDURE
The following procedures must be performed with no load on the trolley jack.
1.
2.
3.
4.
5.
6.
Once the above operations have been carried out, the lift will be ready for use (repeat the procedure
if necessary).
Before using the lift, bleed the hydraulic system: during transport, air could accumulate
in the hydraulic system which could compromise the correct operation of the lift.
HYDRAU
LIC T
R
O
L
LEY JAC
K
14