3<B3@>@7A3
Setting up a Scheduled Maintenance Period
There are two ways to set up a Scheduled Maintenance Period. One is to set it up when configuring the
Deep Freeze Enterprise installation files with the Configuration Administrator (best method for new
deployments) and the other way is to create or update the Maintenance Period using the Enterprise
Console.
Assuming you have already deployed Deep Freeze throughout your network, the following instructions
elaborate on how to create/update the Maintenance Period with the Enterprise Console.
1. Open the Enterprise Console. Select any workstation and right-click on it.
2. Select
Update Maintenance Period.
A toolbar appears at the bottom of the screen.
3. Click
New
. The
Configuration Screen
appears as shown. It only contains the
Restart/Shutdown
,
Maintenance
and
Advanced Maintenance
options.