LOCATION

Choosing the proper location is an important step before 

you begin to assemble the structure.  

The following suggestions and precautions will help you  

determine whether your selected location is the best  

location. 
•  Never erect the structure under power lines.
•  Identify whether underground cables and pipes are  

present 

before

 preparing the site or anchoring the    

structure.

•  Location should be away from structures that could  

cause snow to drift on or around the building.

•  Do not position the high tunnel where large loads 

such as snow and ice, large tree branches, or other 

overhead obstacles could fall.

SITE

After choosing a location, proper preparation of the site is 

essential. Follow the information below.
• 

A level site is required

. The site must be level to  

properly and safely erect and anchor the structure.

•  For sites that are not concrete or gravel, placing wood  

blocks or other suitable supports under each rafter leg 

helps prevent the pipes from sinking or working into the 

site.

•  Drainage: Water draining off the structure and from  

areas surrounding the site should drain away from the  

site to prevent damage to the site, the structure, and  

contents of the structure.

WARNING:

 The individuals assembling this structure 

are responsible for designing and furnishing all  

temporary bracing, shoring and support needed during 

the assembly process. For safety reasons, those who 

are not familiar with recognized construction methods 

and techniques must seek the help of a qualified  

contractor.

YOU MUST READ THIS DOCUMENT BEFORE YOU  

BEGIN TO ASSEMBLE THE SHELTER

.

Thank you for purchasing this Growspan™ high tunnel. 

When properly assembled and maintained, this product will  

provide years of reliable service. These instructions include 

helpful hints and important information needed to safely 

assemble and properly maintain the high tunnel. Please 

read these instructions 

before

 you begin.

If you have any questions during the assembly, contact 

Customer Service for assistance.

SAFETY PRECAUTIONS

•  Wear eye protection.
•  Wear head protection.
•  Wear gloves when handling metal tubes.
•  Use a portable GFCI (Ground Fault Circuit Interrupter) 

when working with power tools and cords.

•  Do not climb on the high tunnel or framing during or 

after construction.

•  Do not occupy the high tunnel during high winds,  

tornadoes, or hurricanes.

•  Provide adequate ventilation if the structure is  

enclosed.

•  Do not store hazardous materials in the high tunnel.
•  Provide proper ingress and egress to prevent  

entrapment. 

ANCHORING INSTRUCTIONS

Prior to assembling this high tunnel, please read the 

MUST 

READ

 document included with the shipment. 

WARNING:

 The anchor assembly is an integral part of 

the high tunnel construction. Improper anchoring may 

cause high tunnel instability and failure of the structure. 

Failing to anchor the high tunnel properly 

will void the 

manufacturer’s warranty

 and may cause serious injury 

and damage.

Содержание GrowSpan PB01700R4

Страница 1: ...e 01 01 16 Photo may show a different but similar model STK DIMENSIONS PB01700R4 26 W x 12 H x 48 L PB01710R4 26 W x 12 H x 96 L 2016 Growers Supply All Rights Reserved Reproduction is prohibited with...

Страница 2: ...t needed during the assembly process For safety reasons those who are not familiar with recognized construction methods and techniques must seek the help of a qualified contractor YOU MUST READ THIS D...

Страница 3: ...ded with the shipment To aid in the assembly read through the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels...

Страница 4: ...ot need to open the plastic bags containing smaller parts such as fasteners or washers if equipped SPECIAL NOTE Baseboards for Frame These instructions describe installing a baseboard recommended at g...

Страница 5: ...photos will help you identify the different parts Some parts are not shown 102856 End Clamp 102548 Cross Connector Swaged Plain Swaged and Plain Rafter Sections CC6212 CC6213 Fabric Clips FA4482B Tek...

Страница 6: ...Quick Start Guide Ground Level End Rafter Inside Rafter Roll Up Side Conduit Purlins Baseboards are supplied by customer Round Premium High Tunnels OVERVIEW This section describes assembling your high...

Страница 7: ...re driving the remaining posts to the required height 8 After all corner posts are accurately installed tie a string line between the tops of the corner ground posts on the same side of the shelter Th...

Страница 8: ...crews so they will not touch the cover once it is installed This is typically on the backside of the rafter which will be the surface visible from the inside of the high tunnel once the frame is assem...

Страница 9: ...the purlin pipe in the joint where the rafter pipes are connected to keep purlins aligned during assembly 7 Repeat the previous step to install a second purlin section See the above diagram for detai...

Страница 10: ...in to extend beyond the end of the end rafter Align with the center of the end rafter for best results If the purlin is too short to fit into the rafter end clamps without pulling the end rafter out o...

Страница 11: ...rp edges on the frame and file them smooth so they will not cut the cover 2 Apply two layers of heavy duct tape on all pipe connections and clamps that may contact the cover ANCHOR THE ASSEMBLED FRAME...

Страница 12: ...LLATION After the end panels are installed install the main cover The steps to install the main cover include 1 Attach poly latch U Channel 102197 along the high tunnel sides and tops of the high tunn...

Страница 13: ...the cover into place Center cover side to side and end to end IMPORTANT To prevent damage to the main cover during installation additional personnel and lifts may be needed INSTALL POLY LATCH U CHANNE...

Страница 14: ...irst end rafter until the entire length of the end of the main cover is secured in place 7 Stretch the cover to the other end of the building and repeat the steps to secure the main cover in the U Cha...

Страница 15: ...of the Wrist assembly and attach it to the frame and the roll up side 4 Install the Anti Billow Rope system 5 Test the operation of the roll up side 4 Place the assembled conduit at the base of the si...

Страница 16: ...ssembly will be located NOTE Verify that the lower end of the channel is slightly off the ground to allow it to move freely when the panel is rolled up and down 5 Secure the upper end of the channel b...

Страница 17: ...m channel from the ground end This is the free end of the channel 13 Roll the cover conduit up to the Twist of the Wrist assembly 14 Attach the conduit to the square shaft of the assembly by inserting...

Страница 18: ...nance information that follows NOTE If the poly latch U Channel was attached to a ribbon board as suggested the eyebolt can be mounted through the poly latch channel and ribbon board to the inside of...

Страница 19: ...at anytime Remove debris and objects that may accumulate on the cover Use tools that will not damage the cover when removing debris Remove snow to prevent excess accumulation Use tools that will not...

Страница 20: ...UND PREMIUM HIGH TUNNELS Revision date 01 01 16 QUICK START GUIDE 26 Wide Round Premium High Tunnels Frame shown may differ in length from actual frame 26 0 Width 12 6 15 16 Heigth FRONT Grid Represen...

Страница 21: ...01 26R1602 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 ATTENTION Except fo...

Страница 22: ...PREMIUM HIGH TUNNELS Revision date 01 01 16 7 131S075 1 131P0735 Purlin Run 48 0 Length Customer Supplied Baseboard Customer Supplied Ribbon Board 4 0 on center Rafter Spacing center to center SIDE P...

Страница 23: ...PREMIUM HIGH TUNNELS Revision date 01 01 16 96 0 Length 15 131S075 1 131P0735 Purlin Run Customer Supplied Baseboard Customer Supplied Ribbon Boards 4 0 on center Rafter Spacing center to center SIDE...

Страница 24: ...id Rafter P urlin Connection View 2 Rafter 102856 View 1 End Rafter Purlin Connection Purlin 102548 Rafter View 2 Mid Rafter Purlin Connection Purlin ATTENTION Install a Tek screw through each clamp i...

Страница 25: ...25 GROWSPAN ROUND PREMIUM HIGH TUNNELS Revision date 01 01 16 Space below is reserved for customer notes...

Отзывы: