FarmTek GrowSpan PB01700R4 Скачать руководство пользователя страница 13

13

GROWSPAN

 ROUND PREMIUM  HIGH TUNNELS

Revision date: 01.01.16

INSTALL MAIN COVER

Gather the parts:
•  Main cover
•  Ropes long enough to reach over the frame (provided 

by customer)

•  U-Channel Spring
•  Box cutter or utility knife 

Assembly Procedure

 

After attaching the poly latch U-Channel to the frame, 

unpack the main cover and pull into place. Ropes or straps 

are typically used to pull the main cover onto and over the 

frame. Ropes may not be needed for some buildings.

WARNING: 

To prevent damage to the cover and to 

prevent serious personal injury, DO NOT attempt to 

install the main cover on windy or stormy days.

1.  Unpack the main cover and position it at the base along 

one side of the frame.

2.  Make small holes along the edge of the cover at evenly 

spaced intervals and tie rope to the cover. (The length 

of the cover determines the number of holes that are 

needed to attach the ropes.) 

 

NOTE:

 The ropes must be long enough to reach over 

the top of the building to the other side. Long buildings 

will require additional ropes to prevent tearing the main 

cover when it is pulled into place.

3.  After tying the ropes to the main cover, throw the ropes 

over the top of the frame and pull the cover into place. 

Center cover side-to-side and end-to-end. 

 

IMPORTANT:

 To prevent damage to the main cover 

during installation, additional personnel and lifts may be 

needed.

INSTALL POLY LATCH U-CHANNEL (Continued)

Shelter shown above may be a different length than the 

actual model.

U-Channel

End Rafter

Begin U-Channel for 

end rafter here.

3.  Repeat these steps for the remaining side.
4.  After attaching the poly latch U-Channel to the sides of 

the frame, use Tek screws to attach the U-Channel to 

the top of one end rafter. 

Space screws at 24".

 

 

ATTENTION: 

The poly latch U-Channel will bend with 

the curve of the rafter as it is attached. The U-Channel 

runs from the poly latch U-Channel attached to one 

side of the frame to the U-Channel attached to the 

other side of the frame.

5.  Repeat the steps to attach the U-Channel to the top 

of the remaining end rafter and continue with the main 

cover installation.

2.  Continue to attach the U-Channel sections to the 

rafters (or ribbon board if used) and work toward the 

other end of the frame. Cut the last section of  

U-Channel to the required length so that it is flush with 

the outside edge of the end rafter.

Ribbon Board 

(optional)

FAH009B bolt installed 

through U-channel, 

board and rafter. 

NOTE:

 Inset shows the use of a ribbon board. 

U-channel can be attached directly to rafters using 

FA4482B Tek screws when ribbon board is not used.

Содержание GrowSpan PB01700R4

Страница 1: ...e 01 01 16 Photo may show a different but similar model STK DIMENSIONS PB01700R4 26 W x 12 H x 48 L PB01710R4 26 W x 12 H x 96 L 2016 Growers Supply All Rights Reserved Reproduction is prohibited with...

Страница 2: ...t needed during the assembly process For safety reasons those who are not familiar with recognized construction methods and techniques must seek the help of a qualified contractor YOU MUST READ THIS D...

Страница 3: ...ded with the shipment To aid in the assembly read through the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels...

Страница 4: ...ot need to open the plastic bags containing smaller parts such as fasteners or washers if equipped SPECIAL NOTE Baseboards for Frame These instructions describe installing a baseboard recommended at g...

Страница 5: ...photos will help you identify the different parts Some parts are not shown 102856 End Clamp 102548 Cross Connector Swaged Plain Swaged and Plain Rafter Sections CC6212 CC6213 Fabric Clips FA4482B Tek...

Страница 6: ...Quick Start Guide Ground Level End Rafter Inside Rafter Roll Up Side Conduit Purlins Baseboards are supplied by customer Round Premium High Tunnels OVERVIEW This section describes assembling your high...

Страница 7: ...re driving the remaining posts to the required height 8 After all corner posts are accurately installed tie a string line between the tops of the corner ground posts on the same side of the shelter Th...

Страница 8: ...crews so they will not touch the cover once it is installed This is typically on the backside of the rafter which will be the surface visible from the inside of the high tunnel once the frame is assem...

Страница 9: ...the purlin pipe in the joint where the rafter pipes are connected to keep purlins aligned during assembly 7 Repeat the previous step to install a second purlin section See the above diagram for detai...

Страница 10: ...in to extend beyond the end of the end rafter Align with the center of the end rafter for best results If the purlin is too short to fit into the rafter end clamps without pulling the end rafter out o...

Страница 11: ...rp edges on the frame and file them smooth so they will not cut the cover 2 Apply two layers of heavy duct tape on all pipe connections and clamps that may contact the cover ANCHOR THE ASSEMBLED FRAME...

Страница 12: ...LLATION After the end panels are installed install the main cover The steps to install the main cover include 1 Attach poly latch U Channel 102197 along the high tunnel sides and tops of the high tunn...

Страница 13: ...the cover into place Center cover side to side and end to end IMPORTANT To prevent damage to the main cover during installation additional personnel and lifts may be needed INSTALL POLY LATCH U CHANNE...

Страница 14: ...irst end rafter until the entire length of the end of the main cover is secured in place 7 Stretch the cover to the other end of the building and repeat the steps to secure the main cover in the U Cha...

Страница 15: ...of the Wrist assembly and attach it to the frame and the roll up side 4 Install the Anti Billow Rope system 5 Test the operation of the roll up side 4 Place the assembled conduit at the base of the si...

Страница 16: ...ssembly will be located NOTE Verify that the lower end of the channel is slightly off the ground to allow it to move freely when the panel is rolled up and down 5 Secure the upper end of the channel b...

Страница 17: ...m channel from the ground end This is the free end of the channel 13 Roll the cover conduit up to the Twist of the Wrist assembly 14 Attach the conduit to the square shaft of the assembly by inserting...

Страница 18: ...nance information that follows NOTE If the poly latch U Channel was attached to a ribbon board as suggested the eyebolt can be mounted through the poly latch channel and ribbon board to the inside of...

Страница 19: ...at anytime Remove debris and objects that may accumulate on the cover Use tools that will not damage the cover when removing debris Remove snow to prevent excess accumulation Use tools that will not...

Страница 20: ...UND PREMIUM HIGH TUNNELS Revision date 01 01 16 QUICK START GUIDE 26 Wide Round Premium High Tunnels Frame shown may differ in length from actual frame 26 0 Width 12 6 15 16 Heigth FRONT Grid Represen...

Страница 21: ...01 26R1602 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 ATTENTION Except fo...

Страница 22: ...PREMIUM HIGH TUNNELS Revision date 01 01 16 7 131S075 1 131P0735 Purlin Run 48 0 Length Customer Supplied Baseboard Customer Supplied Ribbon Board 4 0 on center Rafter Spacing center to center SIDE P...

Страница 23: ...PREMIUM HIGH TUNNELS Revision date 01 01 16 96 0 Length 15 131S075 1 131P0735 Purlin Run Customer Supplied Baseboard Customer Supplied Ribbon Boards 4 0 on center Rafter Spacing center to center SIDE...

Страница 24: ...id Rafter P urlin Connection View 2 Rafter 102856 View 1 End Rafter Purlin Connection Purlin 102548 Rafter View 2 Mid Rafter Purlin Connection Purlin ATTENTION Install a Tek screw through each clamp i...

Страница 25: ...25 GROWSPAN ROUND PREMIUM HIGH TUNNELS Revision date 01 01 16 Space below is reserved for customer notes...

Отзывы: