10
10
Revision date: 08.26.15
Assembly Instructions
4
INSTALL ROLLER PIPES
1. Move to one end support crossbar and
measure 10" in from the bracket at each end of
the crossbar. Mark the points.
3. Set the two roller pipes on the frame.
2. Install one FA4482B Tek screw at each point
marked on the crossbar.
4. Position each pipe between the crossbar
bracket and the Tek screw installed in the
crossbar.
NOTE:
These Tek screws function as roller
pipe stops and help keep pipes aligned during
operation.
NOTE:
Final adjustment of the roller pipes
takes place after bench top is installed.
Gather the roller pipe parts:
• (2) 1.315" diameter pipes (See Quick Start section for pipe lengths and identification.)
• FA4482B Tek screws
10"
Roller Pipe Stops