
26
26
113542
Revision date: 09.21.18
10
Basic System Check Before Operation
Basic System Check
Complete these steps:
1. Set trays in place on each rack. Position the tray end that is curved upwards below the drippers at the high end of the frame.
Carefully slide all trays into
position for testing. Do not contact the drippers with trays. Drippers are fragile! They may break.
2. Verify that the on-floor drain channel (if used) is positioned as needed to direct water to the floor drain or recapture tank.
3. Enlist the services of a licensed professional plumber to connect the main water supply to the assembled fodder system. (
Do not turn water on until the
WR1220 solenoid is set. See Procedure 11 on next page.)
4. Enlist the services of a licensed professional electrician to connect the main power to the timer and the timer to the solenoid. (Consult the documentation
included with the timer to properly connect it.)
5. Set the WR1220 solenoid valve as described in Procedure 11 on the next page.
6. After completing Procedure 11, set the timer according to the desired watering cycles.
7. With the water running, inspect each dripper to ensure proper operation.
8. After checking the system and setting the desired watering cycles, continue by soaking the seed and seeding the trays.
*Actual system may differ from what is shown in these photos.