
Maintenance - 13” Conventional Auger
101
AXLES
Wheel Bolt Torque
IMPORTANT
Check Wheel Bolts After:
1.
First 3 (three) hours of field operation.
2.
First 10 (ten) hours of field operation.
3.
First 50 (fifty) hours of field operation.
REPEAT PROCEDURE IF A WHEEL IS
REMOVED OR REINSTALLED
Torque wheel bolts to 120 ft-lbs (162 Nm).
Tighten wheel bolts in a criss-cross pattern.
Tire / Wheel Replacement
Periodically check tires for cuts, bulges and
damaged rims.
WARNING
AVOID INJURY OR DEATH
Before you leave the operator’s position:
•
Always park on a flat level surface.
•
Place all controls in NEUTRAL.
•
Engage the park brake.
•
Stop the engine and remove the key.
•
Wait for all moving parts to stop.
Park the tractor / equipment on a flat level surface.
Place all controls in neutral, engage the park brake,
stop the engine and wait for all moving parts to
stop. Leave the operator’s position.
WARNING
AVOID INJURY OR DEATH
Always chock tires before performing any
maintenance or service.
Place chock blocks behind and in front of the
opposite tire to be removed.
Raise axle frame with jack until the tire / wheel is
slightly off the ground.
NOTE: Place blocks / stands under the frame to
secure the equipment when tire / wheel is
raised off the ground.
Remove the six wheel bolts and tire assembly.
Figure 157
Install the new tire with the valve stem facing out.
Reinstall six wheel bolts (Items 1). Tighten wheel
bolts in a criss-cross pattern
Tighten wheel bolts to proper torque.
Lower tire / wheel assembly to the ground.
After tightening the wheel bolts, pull the equipment
approximately one mile and re-tighten the wheel
bolts to proper torque.
1
Содержание 1342
Страница 1: ...082020 FK422 OPERATOR AND PARTS MANUAL 13 CONVENTIONAL AUGER Models 1342 1352 1362 ...
Страница 2: ......
Страница 4: ... 13 Conventional Auger ii ...
Страница 6: ... 13 Conventional Auger 2 ...
Страница 8: ...Warranty Registration Form 13 Conventional Auger 4 ...
Страница 10: ...Introduction 13 Conventional Auger 6 ...
Страница 13: ...Introduction 13 Conventional Auger 9 BRIDGING TRUSS CABLE 52 FT MODEL 62 FT MODEL ...
Страница 14: ...Introduction 13 Conventional Auger 10 ...
Страница 16: ...Safety 13 Conventional Auger 12 ...
Страница 23: ...Safety 13 Conventional Auger 19 ...
Страница 84: ...Operation 13 Conventional Auger 80 ...
Страница 98: ...Maintenance 13 Conventional Auger 94 ...
Страница 108: ...Maintenance 13 Conventional Auger 104 ...
Страница 110: ...Parts Identification 13 Conventional Auger 106 AXLE STUB W HUB 175 HUB 176 WHEEL ANDTIRE 177 ...
Страница 111: ...Parts Identification 13 Conventional Auger 107 ...
Страница 156: ...Parts Identification 13 Conventional Auger 152 PTO Belt Drive Mount C1342 8 3 5 10 9 12 3 5 7 3 1 5 4 2 6 11 ...
Страница 182: ...Parts Identification 13 Conventional Auger 178 ...
Страница 184: ...Specifications 13 Conventional Auger 180 ...
Страница 186: ...Specifications 13 Conventional Auger 182 HARDWARETORQUE VALUES Metric Chart ...
Страница 187: ...Specifications 13 Conventional Auger 183 Imperial Chart ...
Страница 190: ...Warranty 13 Conventional Auger 186 ...
Страница 193: ......