SER150
Energy Recovery Ventilators
Installation Manual
Item #: 427470
Rev Date: 2017-07-28
Your ventilation system should be installed in conformance with the appropriate provincial/state requirements or, in the
absence of such requirements, with the current edition of the National Building Code, and / or ASHRAE’s “Good Engineering
Practices”.
Fantech reserves the right to modify, at any time and without notice, any or all of its products’ features, designs,
components and specifications to maintain their technological leadership position.
Please visit our website www.fantech.net for more detailed technical information.
United States
10048 Industrial Blvd., Lenexa, KS, 66215
Tel.: 800.747.1762 • Fax: 800.487.9915
Canada
50 Kanalflakt Way, Bouctouche, NB, E4S 3M5
Tel.: 800.565.3548 • Fax: 877.747.8116