INTERIOR DUCTING INSTALLATION

•  To maximize airflow through the ductwork system, all ducts should be kept short and have as few bends or elbows as possible.

•  45º elbows are preferable to 90º.

•  Use “Y“ ducts instead of “T” ducts whenever possible.

•  All duct joints must be fastened with screws or duct sealant and wrapped with aluminum foil duct tape to prevent leakage.

•  Galvanized ducting from the ERV to the living areas in the house is recommended whenever possible, although flexible ducting 

can be used in moderation when necessary.

•  To avoid possible noise transfer through the ductwork system, a short length (approximately 300 mm, 12’’) of nonmetallic flexible 

insulated duct should be connected between the ERV and the supply/exhaust ductwork system.

•  The main supply and return line to/from the ERV must have the same diameter as the duct connection or larger.

•  Branch lines to the individual rooms may be as small as 100 mm (4’’).

Installing ducting to ERV  

For flexible duct installation, slide flexible ducting onto duct connection. Then install a 
cable tie over flexible duct to prevent leakage between the ducting and the duct 
connection.

In the case of solid ducting, slide duct over duct connection, screw in place and sea

l.

Supply air grilles location

In homes without a forced air furnace, fresh air should be supplied to all habitable rooms, including bedrooms and living areas. It should be supplied 
from high wall or ceiling locations. Grilles that diffuse the air comfortably are recommended. In homes with a forced air furnace, you may want to connect 
the ERV to the furnace ductwork (see information below).

Exhaust air grilles location

The stale air exhaust system is used to draw air from the points in the house where the worst air quality problems occur. It is recommended that return 
air ducts be installed in the bathroom, kitchen, and laundry room. Additional return air ducts from strategic locations may be installed. The furnace 
return duct may also be used to exhaust from. In this method, the exhaust air is not ducted back from bathrooms, kitchens, etc to the ERV with 
“dedicated lines”.

As per building codes and installation requirements for combustion appliances:

Air return ducts, or openings for air return, should not be placed in enclosed spaces containing combustion 

appliances that are subject to spillage.

Содержание SER150

Страница 1: ...ode and or ASHRAE s Good Engineering Practices Fantech reserves the right to modify at any time and without notice any or all of its products features designs components and specifications to maintain their technological leadership position Please visit our website www fantech net for more detailed technical information United States 10048 Industrial Blvd Lenexa KS 66215 Tel 800 747 1762 Fax 800 4...

Страница 2: ...nted combustion equipment i e Gas Furnaces Oil Furnaces Wood Stoves etc Products are designed and manufactured to provide reliable performance but they are not guaranteed to be 100 free of defects Even reliable products will experience occasional failures and this possibility should be recognized by the user If these products are used in a life support ventilation system where failure could result...

Страница 3: ...rhood Location 8 Installing the ducting to the weatherhood 8 INTERIOR DUCTING INSTALLATION General Tips 9 Installing duct to ERV 9 Supply Exhaust Air Grilles Location 9 ERV INSTALLATION 10 AIRFLOW ADJUSTMENT BALANCING Start up procedure 11 Airflow balancing 11 LOW VOLTAGE CONTROL SYSTEMS 13 WIRING DIAGRAM 14 TROUBLESHOOTING 16 ERV MAINTENANCE CHART 17 ERV CORE WASHING INSTRUCTION 18 PARTS LIST 19 ...

Страница 4: ... area Bedrooms 0 1 2 3 4 5 6 7 7 Ft2 m2 CFM L s CFM L s CFM L s CFM L s CFM L s 1500 139 30 14 45 21 60 28 75 35 90 42 1501 3000 139 1 279 45 21 60 28 75 35 90 42 105 50 3001 4500 279 1 418 60 28 75 35 90 45 105 50 120 57 4501 6000 418 1 557 75 35 90 42 105 50 120 57 135 64 6001 7500 557 1 697 90 42 105 50 120 57 135 64 150 71 7500 697 105 50 120 57 135 64 150 71 165 78 ASHRAE 62 2 2010 Table 4 1 ...

Страница 5: ...The ERV s airflow must be balanced after installation using the procedure found in the section AIRFLOW BALANCING Suggested installation for Hydronic baseboard Infloor heating Electric baseboard Mini split heat pump Benefits Provides the best fresh air distribution in the house lowest operation cost since the furnace air handler unit is not needed Air from inside Unit air flow should be balanced wh...

Страница 6: ... 2 Stale air is drawn from key areas of the home bathroom kitchen laundry room 3 Fresh air is supplied to the return air plenum of the furnace 4 Due to the difference in pressure between the ERV and the equipment it is being connected to the ERV s airflow must be balanced on site using the procedure found in the section AIRFLOW BALANCING In the case of a multi zone system please contact Fantech cu...

Страница 7: ...fresh air the ERV s exhaust air connection should be upstream of the ERV s supply air connection when ducting to the furnace s cold air return 4 Due to the difference in pressure between the ERV and the equipment it is being connected to the ERV s airflow must be balanced on site using the procedure found in the section AIRFLOW BALANCING In the case of a multi zone system please contact Fantech cu...

Страница 8: ...arrier must be completely sealed to the outer wall and the ERV using tape and or caulking A good bead of high quality caulking preferably acoustical sealant will seal the inner flexible duct to both the ERV duct connection and the weatherhood prior to securing them To minimize airflow restriction the flexible insulated duct that connects the two outside weatherhoods to the ERV should be stretched ...

Страница 9: ...exible duct to prevent leakage between the ducting and the duct connection In the case of solid ducting slide duct over duct connection screw in place and seal Supply air grilles location In homes without a forced air furnace fresh air should be supplied to all habitable rooms including bedrooms and living areas It should be supplied from high wall or ceiling locations Grilles that diffuse the air...

Страница 10: ...p fan Central vacuum system Bathroom exhaust fans unless they are specifically designed for this purpose These appliances may cause lint dust or grease to collect in the ERV damaging the unit Connecting any of these types of appliances to the ERV will void your warranty Mounting Chain mount Have a nearby power supply 120 volts 60Hz Choose a location which allows the possibility of mounting the uni...

Страница 11: ...s close to room temperature as possible For optimal performance ERV unit should be re balanced after a major renovation or after the installation of extra grilles or registers 1 Remove the nutsert INSTALLING DRAIN LINE Through normal operation and during its defrost mode the ERV may produce some condensation This water should flow into a nearby drain or be taken away by a condensate pump The ERV a...

Страница 12: ...o be made prior to any transition in the duct work so entire airflow is measured Measuring the airflow using station grid method Adjusting airflows A damper is integrated into the Fresh Air to Building collar This damper replaces the installation of a separate damper into the Fresh Air to Building ducting line The damper collar is pre set in the fully opened position If the procedure requires a re...

Страница 13: ...referred indoor relative humidity range and ventilation mode for day and night conditions No battery to replace all programmed settings are retained during power outage Maintenance reminder indicator Error code messages reduce troubleshooting time EDF7 MODE button provides 3 modes of operations Ventilation Recircula tion and Standby User selected fan speed Reduced Medium Normal and 20 minutes per ...

Страница 14: ...14 WIRING DIAGRAM Observe polarity on all accessory controls where applicable ...

Страница 15: ...ECTION TO A COOLING SYSTEM On some newer furnaces and older thermostats energizing the R and G terminal at the furnace has the effect of energizing the Y at the thermostat and thereby turning on the cooling system If you identify this type of thermostat you must use the Alternate Furnace Interlock Wiring Standard Accessory Control Contact Alternative Accessory Control Contact As per building codes...

Страница 16: ... power supply at site Have electrician check supply voltage Ductwork is restricting airflow Check duct installation Improper speed control setting Increase the speed of the ERV i e change unit control from REDUCED to NORMAL speed ERV airflow improperly balanced Have contractor balance ERV airflows Ducting has fallen down or been disconnected from ERV Have contractor reconnect ducting Supply air fe...

Страница 17: ...mages incurred in the use of the ventilation system Fantech is not responsible for providing an authorized service centre near the purchaser or in the general area Fantech reserves the right to supply refurbished parts as replacements Transportation removal and installation fees are the responsibility of the purchaser The purchaser is responsible to adhering to all codes in effect in his area This...

Страница 18: ...ore s air inlets facing down place it in a large sink bathtub or shower 4 Pour clean tap water through the face of the core facing upwards until it runs clear Ensure the entire surface is rinsed 5 Rotate the core so that its other air inlet is facing down and repeat step 5 6 With plates still oriented vertically allow the core to dry normally 2 3 hours 7 Slide back the core into the unit 8 Replace...

Страница 19: ...very Cell 9 x 9 x 15 427473 4 Capacitors 8uF 410012 5 Kit PCB Replacement Board AC 422677 6 Door Switch 410867 7 Auto Transformer 411963 8 Control Switch 410213 9 Kit Drain Plug 40315 10 Collar 6 Balancing 10mm 403382 11 Collar 6 24mm LIP 410542 15 Temperature Probe 40286 16 Door Assembly 405532 Kit Chain 404261 Wall Support VHR120R 150R 426466 Wiring Diagram 423054 ...

Страница 20: ...Fantech reserves the right to make technical changes For updated documentation please refer to www fantech net Fantech ...

Отзывы: