Page 18
Step 25
Step 26
You will need
Phill
i
ps
H
ead
Screwdriver
(H5)
12 x Small Dowels
(H19)
6 x Pads
This is how a cam nut works........
The head of the
cam bolt goes into
the open mouth of
the cam nut. You
then turn the cam
nut so it tightens
over the bolt.
12pcs (H3)
4pcs (H4)
This is how a cam nut works........
The head of the
cam bolt goes into
the open mouth of
the cam nut. You
then turn the cam
nut so it tightens
over the bolt.
4 x Screws
(H7)
P19
(H5)
P20
P17
P18
P21
P22
P47
This side has raw edge
This side has raw edge
(H7)
(H5)
(H7)
(H7)
(H7)
(H5)
(H5)
(H5)
(H5)
(H5)
(H5)
(H5)
(H5)
(H5)
(H15)
(H15)
(H15)
You will need
(H15)
28 x Nails
Hammer
P24
P20
P18
P17
P19
P24
(H15)
(H15)
(H15)
(H15)
(H15)
(H15)
(H15)
H15)
(H15)
(H15)
(H15)
(H15)
(H19)
(H19)
(H19)
(H19)
(H19)
(H19)
(H15)
(H15)
(H15)
(H15)
Slot in the Support Bar (P47) into the grooves of the Side Panels (P19 & P20).
Insert 12 x Small Dowels (H5) into the Top Panel (P17) and Base Panel (P18) as shown.
Attach the Top Panel (P17) to Panels (P19, P20, P21 & P22) by aligning the holes and
tightening the cam nuts with a Phillips Head Screwdriver.
Attach the Base Panel (P18) to Panels (P19 & P20) with 4 x Screws (H7) tightening with
a Phillips Head Screwdriver.
Face up with paper
lamination
5
5mm
(H15)
(H15)
(H15)
(H15)
(H15)
(H15)
(H15)