- 3 -
Transmission programmable using the button located under the
lower casing meter terminals.
For safety reasons, the data logging function can make
the gear set only once.
CT current values Ip inscribed in memory device:
5, 25, 40, 50, 60, 75, 80, 100, 120, 150, 200, 250, 300, 400, 500,
600, 800, 1000, 1200, 1500, 1600, 2000, 2500, 3000, 4000, 5000,
6000.
Another pressing the programming button jumps to the next
value.
After switching to the desired value in order to confirm the se-
lected value to hold the key from 35 to 45 sec.
To verify the correctness of the programming, the power supply
must be switched off for a while.
After switching on again, the display will show the value of
the entered ratio, such as the factory value:
"
5 - - 5
"
(factory
settings).
Programming
Содержание LE-02d CT
Страница 6: ... 6 voltage inputs 1 L1 phase 2 L2 phase 3 L3 phase 4 neutral N wire Wiring diagram ...
Страница 12: ......