F&F CKF-318 TRMS Скачать руководство пользователя страница 10

- 10 -

»

Please read the instructions carefully before installation.

»

The device should be installed and operated by qualified per-

sonnel who are familiar with its design, operation, and asso-

ciated risks.

»

Do not install a sensor that is damaged or incomplete.

»

The user is responsible for proper grounding of the system, 

proper selection, installation, and efficiency of other devices 

connected to the sensor, including safety devices such as over-

current, residual current, and overvoltage circuit breakers.

»

Before connecting the power supply, make sure that all cables 

are connected correctly.

»

It is essential to observe the operating conditions of the sensor 

(supply voltage, humidity, temperature).

»

To avoid electric shock or damage to the sensor, turn off the 

power supply whenever the connection is changed.

»

Do not make any changes to the unit yourself. Doing so can re-

sult in damage to or improper operation of the device, which 

in turn can pose a threat to people operating it. In such cases, 

the manufacturer is not responsible for the resulting events 

and may refuse the provided warranty in the event of a com-

plaint.

General work safety conditions

E210416

Содержание CKF-318 TRMS

Страница 1: ...true rms value of the voltage TrueRMS even when the power supply voltage is disturbed distorted Purpose F F Filipowski sp j Konstantynowska 79 81 95 200 Pabianice POLAND phone fax 48 42 215 23 83 48...

Страница 2: ...ental shutdowns in case of temporary interferences in the power supply network If the voltage drops below 320 V or rises above 480 V the discon nection is carried out after 1 sec The countdown to shut...

Страница 3: ...3 Front panel...

Страница 4: ...current state of the output Asymmetry or exceeding of the voltage threshold Relay switched off voltage value of any of the phases below 150 V or above 280 V or asymmetry above the set value Incorrect...

Страница 5: ...5 Voltage waveforms Legend T1 1 10 sec T2 1 60 sec...

Страница 6: ...erminals of the device the relay will be switched off immediately The red LED will be on to indicate a phase sequence error When the correct phase sequence returns the relay will be switched on with a...

Страница 7: ...1 Swap the 2 phases for example L2 with L3 12 Switch on the power supply the motor can be started 13 In any other case than those described in points 8 and 9 see the signaling table page 4 Wiring diag...

Страница 8: ...t separated 2 NO NC maximum load current AC 1 2 6 A power supply control 2 LED minimum phase voltage 320 V maximum phase voltage 480 V voltage asymmetry of activation 20 80 V voltage hysteresis 5 V sw...

Страница 9: ...nly with proof of purchase Contact your dealer or directly with us F F Filipowski sp j declares that the device is in conformity with the essential requirements of The Low Voltage Directive LVD 2014 3...

Страница 10: ...ltage circuit breakers Before connecting the power supply make sure that all cables are connected correctly It is essential to observe the operating conditions of the sensor supply voltage humidity te...

Страница 11: ......

Отзывы: