background image

MANC36 Rev A

042921

8

 

5.7 Removal of the Anchor:

 

1. 

To remove the anchor, push down on the Easy Button with both thumbs or palms to release the chocks; see Figure 8.

2. 

Pull the retractor handle to retract the chocks, pull the unit out of the hole; see Figure 9.

3. 

If the anchor is stuck, tap the Easy Button with any handy object until the anchor is dislodged .

4. 

If step 3 was required, immediately inspect the unit thoroughly. If damaged, remove from service immediately.

6.1   

Maintenance: 

Clean the FallTech® Removable Concrete Anchor with water and mild detergent.  Do not allow excessive build-up of dirt,    

 

paint or other agents that may cause binding of the mechanism.  Avoid water or other corrosion causing elements to enter the anchor.

6.2

   

Proper Care:

• 

Keep the Removable Concrete Anchor clean and free of contaminants, this will greatly increase the service life.

• 

Use a damp rag and a mild soap and water solution to clean the hardware. Wipe the hardware dry with a clean soft cloth.

• 

DO NOT

 use heat to dry.

• 

DO NOT

 use any solvents or petroleum products to clean this anchor.

• 

DO NOT

 attempt to repair or modify this Concrete Anchor or any of its components. Such attempts will void the warranty    

 

 

and may result in serious injury or death.

6.3   

Storage:

 Store in a clean, dry, and chemical free environment and kept out of direct sunlight.

6.0  Maintenance, Service, and Storage

7.0  Inspection

 

7.1 Pre-Use Inspection:

  Please review the Pre-Use Inspection guidelines in Section 5.2 for inspection requirements.

 

7.2 Inspection Frequency: 

Inspection by a competent person at regular intervals is required. The competent person will use the 

 

information in Table 1: Inspection Frequency, to determine the inspection frequency. 

Table 1: Inspection Frequency

Type of Use

Application Examples

Example Conditions of Use

Competent 

Person 

Inspection 

Frequency

Infrequent to 

Light Use

Rescue and confined space, 

factory maintenance

Good storage conditions, indoor or infre

-

quent outdoor use, room temperature, clean 

environments

Annually

Moderate to 

Heavy Use

Transportation, 

residential construction 

utilities, warehouse

Fair storage conditions, indoor and extended 

outdoor use, all temperatures, clean or dusty 

environments

Semi-annually to 

annually

Severe to 

Continuous 

Use

Commercial 

construction, oil and gas, 

mining, foundry

Harsh storage conditions prolonged or con

-

tinuous 

outdoor use, all temperatures, dirty environ

-

ments

Quarterly to 

semi-annually

 

7.3 Inspection Results:

 If an inspection reveals defects in or damage to the equipment, inadequate maintenance or activated fall 

 

indicators, remove the equipment from service. 

Figure 8 - Anchor Removal

Figure 9 - Anchor Removal

Содержание 7443

Страница 1: ...CA 90221 USA Tel 800 719 4619 Fax 323 752 5613 This manual is intended to meet the Manufacturer s Instructions as required by the American National Standards Institute ANSI Z359 and should be used as...

Страница 2: ...Maintenance Service and Storage 7 0 Inspection 8 0 Labels 9 0 Specifications 3 4 4 5 6 8 8 10 10 MANC36 Rev A 042921 2 For purposes of this manual the FallTech Removable Concrete Anchor in all iterati...

Страница 3: ...eath due to falls because of increased fall arrest forces placed on the user s body In addition the onset of suspension trauma after a fall even may be accelerated for heavy users The user of the equi...

Страница 4: ...ecomes difficult to remove IN ALL CASES A COMPETENT PERSON SHALL INSPECT FOR PROPER INSTALLATION AND REMOVAL OF THE REMOVABLE CONCRETE ANCHOR 3 4 Approved Applications Below are applications for which...

Страница 5: ...n a way that would produce a condition of loading on the gate D Never attach to a object in a manner whereby the gate of the snap hook or carabiner would be prevented from fully closing and locking Al...

Страница 6: ...quipment must determine the MRFC for units discussed in this manual to ensure adequate clearance exists in the fall path Variables discussed in this manual include the height of the anchor point relat...

Страница 7: ...anual may be re inserted in a previously used anchor insertion hole that passes pre use inspection The previously used hole must still retain the same depth diameter and functional properties as descr...

Страница 8: ...or death 6 3 Storage Store in a clean dry and chemical free environment and kept out of direct sunlight 6 0 Maintenance Service and Storage 7 0 Inspection 7 1 Pre Use Inspection Please review the Pre...

Страница 9: ...rial _________________________ Date of Manufacture _________________________ INSPECTION DATE INSPECTOR COMMENTS PASS FAIL CORRECTIVE ACTION NEEDED APPROVED BY 7 4 Inspection Document Record inspection...

Страница 10: ...Concrete Anchor Model Application Dimensions Minimum Tensile Strength and Material Maximum User Capacity Image 7443 Expansion Wedge Anchor with Swaged Loop Cured Concrete 3 000 psi Min 11 3 4 Drilled...

Отзывы: