23
4.
For slide rail installation, fasten the inner portion of the slide rail to the UPS on both sides with
the screws provided. (4) (8-32 x 3/16”) Follow any additional instructions that are included with
the optional slide rail kit (SGRMKIT).
5.
Attach the two mounting brackets to the rack’s mounting rails.
6.
After checking alignment, tighten all screws.
Содержание SSG1.5KRM-2
Страница 2: ...2...
Страница 5: ...5 Double Conversion On line UPS Block Diagram...
Страница 7: ...7 Symbols Important Instruction Special Note Recycle Do not dispose with ordinary trash...
Страница 12: ...12 SSG2 2 to 3KRM Models SSGR SSGR 1 2 Models...