INSTALLATION
Check the appliance is electrically safe and gas sound when you have finished.
32
Final Checks
Hotplate Check
Check each burner in turn (refer to the ‘Hotplate Burners’
section at the front of the instructions).
Oven Check
Set the clock as described earlier in the instructions, and then
turn on the ovens. Check that the oven fan starts to turn and
that the ovens start to heat up.
Note
: The oven light bulbs are not included in the guarantee.
Turn off the oven.
Fitting the magnetic plinth
Simply fix the two magnets, suppled with the plinth, to the
bottom edge of the cooker. Then fit the plinth, adjusting it to
your desired height
(Fig. 9.19)
.
Customer Care
Installer
: Please complete your details in this guide, inform
the user how to operate the cooker and hand over the
instructions.
Thank you.
Fig. 9.19
Содержание Professional+ 100FX Dual Fuel
Страница 1: ...USER GUIDE INSTALLATION INSTRUCTIONS Professional 100FX Dual Fuel U111301 01 ...
Страница 2: ......
Страница 4: ...ii ...
Страница 48: ...Clarence Street Royal Leamington Spa Warwickshire CV31 2AD England www falconworld com ...