2.5.2 Aeration Setting
(not G3441)
Burner aeration is factory set, but if adjustment is required
it may be achieved by means of the shroud at the burner
inlet. Check that burner flames remain stable during
ignition, cross lighting and operation of thermostatic
control. Yellow tipping of flames is not acceptable on
natural gas models, however a small yellow tip is
acceptable on propane.
Note
: Griddle plate must be tilted as detailed in Section
3.1.2. Care must be taken as plate is very heavy.
Gas Type
Dimension ‘A’
Natural
5mm
Propane
fully closed
2.5.3 Aeration Setting
(G3441)
Replace shroud as per gas type.
2.5.3 Gas Tightness
After installation, the engineer responsible should check
that all connections are gas sound and ensure that unit is
operating satisfactorily before leaving premises.
2.6 INSTRUCTION TO USER
After installing and commissioning appliance, please
hand User Instructions to user or purchaser and ensure
the person
(s)
responsible understands the instructions
for lighting, cleaning and correct use of appliance.
It is important to ensure that location of gas isolating cock
is made known to user and that procedure for
operation during an emergency is demonstrated.
Advise User that unit and installation should be
SERVICED and INSPECTED REGULARLY as
recommended on title page of this document.
SECTION 2 - ASSEMBLY and
COMMISSIONING
2.1 ASSEMBLY
2.1.1 Unpacking
Remove any packing material etc. and ensure that
burners are correctly located over injectors and
located properly at rear.
2.1.2 Positioning
Position unit and level using feet adjusters. If it is to be
mounted on a purpose floor stand, refer to instructions
supplied with stand. The griddle is now ready for
connection to gas supply.
2.2 CONNECTING TO THE GAS SUPPLY
With unit in position
(see Section 1.2)
connect to gas
supply in accordance with Section 1.4 of these
instructions. For Natural Gas applications, governor
supplied must be fitted and must be adequately
supported and accessible to facilitate adjustment.
DO NOT fit a governor on Propane gas installations.
Purge installation and check gas tightness see IGE/UP/1.
2.3 CONNECTION TO AN ELECTRICITY SUPPLY
Not applicable to these appliances.
2.4 CONNECTION TO A WATER SUPPLY
Not applicable to these appliances.
2.5 PRE-COMMISSIONING CHECK
2.5.1 Setting the Gas Pressure
Connect a suitable pressure gauge to pressure test
point and check pressure is as stated in Section 1.9.
All burners on natural gas appliances must be lit
when pressure is set to 15 mbar at the supplied
governor.
Содержание G3441
Страница 8: ......