Ensure no gaps are present in insulating beads and cover beads with heat resistant
insulating sleeving
Ensure that earth wire is connected by securing it to hole in control box.
Replace in reverse order.
3.10 FAST BOILING PLATES
Proceed as detailed in Section 3.9 until assembly is clear of range. Remove lower
box and disconnect beaded connections, noting their locations.
Undo nut that secures hotplate in position and remove hotplate.
When re-fitting, ensure that all earth-bonding wires are properly re-connected.
Содержание E2102
Страница 18: ...E2102 3 HOTPLATE CONVECTION OVEN RANGE E2102 4 HOTPLATE CONVECTION OVEN RANGE ...
Страница 19: ...E2112 CONVECTION OVEN RANGE ...
Страница 20: ......