Installation
Page
2
/9
2.2
Requirements
For installing the VISY
-
Output
1 in the VISY
-
Command, an interface card of version VI
-
4 or
higher must be present.
2.3
Installation
VISY
-
Output 1 is designed for installation in the VISY
-
Command. For installation, the VISY
-
Output
1 is plugged onto the DIN mounting rail inside the VISY
-
Command. Hold the
module carrier of
VISY
-
Output
1’at an angle to the mounting rail and plug the snap
-
on
foot onto the rail in such a way that one side of the module holder is fixed in place. Then
press the other side of the module carrier onto the rail until this side snaps in and the
module carrier sits firmly.
The VISY-Output 1 can be used only in conjunction with the VI-... interface
card (version VI-4 and above).
Mount the VISY-Output 1 leftward next to the VI-... interface card on the DIN rail.
The module carrier can be released from the rail only by levering with a
screwdriver
2.3.1
Design and construction
The following figure shows the position of the connectors and LEDs on the circuit board of
the VISY
-
Output 1(description in the following chapter):
Figure
1
: Structure of VISY
-
Output
1
5
4
3
2
1
6
7
Содержание VISY-Output 1
Страница 12: ......
Страница 13: ...Blank page...
Страница 14: ...Blank page...
Страница 15: ...Blank page...