M10
!
!
!
M10
[B]
Once satisfied that voltage is properely supplied to the system, and provided that the LEDs of the limit switches are correctly
switched (post down L8 is OFF), by the first pulse the post should rise, if not swap the motor live connections (in Elpro S40)
after voltage supply to the system has been switched off.
ATTENTION: a 40 µF capacitor is pre-wired inside the junction box. For the Talos option 4 mm thickness (steel
and inox/stainless steel) do NOT connect any more capacitors to the terminals A and B of the Elpro S40
controller unless required to achieve a good performance of the bollard. For the Talos option 12 mm thickness
a 20 µF capacitor is required to be added to the terminals A and B of Elpro S40.
common
common
connections to the electric motor
of the hydraulic motor pump
Bollard raised:
gateway closed
1° pulse
If the application requires more than one bollard, go through all of the steps with each
Pic. 17
FIXING THE COVER PLATES OF THE BOLLARD
NOTE WELL: BOLLARD AND COVER PLATE ARE TO BE
PERFECTLY CENTERED, SO THAT THE GAP BETWEEN
BOLLARD AND COVER PLATE HOLE IS EQUALLY
SPACED ALL AROUND
The cover plate is to firmly rest all over the
surface and closely adhere to the circular flange
around the post
Pic. 18
Pic. 19
GREASE
NOTE WELL: IT IS RECOMMENDED
THAT ALL OF THE FIXING SCREWS
BE GREASED
Retractable Oil-hydraulic Bollard
English
13