
355 (Ctrs)
1200 (Ctrs)
1200 (Ctrs)
355 (Ctrs)
5
0
0
Ground
Level
Foundation 2 no. pads
300 x 300 x 900mm in C20
concrete (recommendation only)
900
900
1200 (Ctrs)
1110 (Ctrs)
650 (Ctrs)
Ground
Level
Foundation 2 no. pads
300 x 300 x 900mm in C20
concrete (recommendation only)
355 (Ctrs)
1200 (Ctrs)
1200 (Ctrs)
355 (Ctrs)
900
900
5
45
(
M
a
x)
3
85
(
M
in)
650 (Ctrs)
1200 (Ctrs)
1110 (Ctrs)
Foundation -
300x300x900mm
concrete block
(recommended)
9
0
12
2 off M10 x 75mm
sleeve anchors (per
base) into Ø12 x 90mm
hole in foundation
Ground
Level
Installation Instructions
ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS COMPLETE UNIT
Ribbon Twist Bench
Ribbon Flat Bench
Ribbon Twist Bench / Ribbon Flat Bench
1. Install suitable foundation pads (see illustration) each with top face
at ground level
2. Position bench in correct orientation with bases centrally on
foundation pads; then mark hole positions through base plate
3. Remove the bench; drill holes Ø12mm x 90mm deep (or as bolt
manufacturer’s recommendations)
4. Clear debris from holes
5. Reposition bench unit and fix to foundation pads using 2 no.
zinc-coated M10 x 75mm sleeve anchors per base tightened to
50Nm (or as per manufacturer’s instruction). Ensure bench remains
level during fixing process
6. Check level and reinstate ground if necessary
IMPORTANT NOTE:
Ensure that stainless steel is protected during site cutting of stone –
contamination from disc cutters will produce corrosion on stainless
steel components.
5
RIBBON installation