![Fac S220 Pro Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/fac/s220-pro/s220-pro_installation-use-and-maintenance-manual_4582267019.webp)
15
REASSEMBLING THE MACHINE
Proceed as indicated for the previous operations but in reverse order.
MAINTENANCE
GENERAL
The operator is allowed to perform the following maintenance operations:
Blade sharpening:
regularly (intervals and duration obviously depend on the
use of the machine, time of use and type of product sliced);
Lubrication of carriage sliding guides:
once a week.
Lubrication of product grip sliding bar:
once a week
.
Adjustment of motor belt tension:
as required.
Checking the power supply cord conditions and of the gland plate:
from
time to time.
.
WARNING
Maintenance must always be carried out when the
machine is
disconnected from the mains
and if no other position is
specifically required, with the thickness control knob on '0'.
not specifically
The following maintenance operations are to be entrusted only to
personnel
authorized by the manufacturer
:
Replacing the blade;
Replacing the sharpener stones;
Replacing the motor transmission belt;
Replacing electrical system components under the machine base;
Repairing structural parts, repairing the components under the base.
BLADE SHARPENING
Before proceeding, clean the machine accurately as explained in the previous
paragraphs:
WARNING
Sharpening can be done only up to 12 mm of the blade diameter
value.
Beyond this value, the BLADE MUST BE REPLACED ONLY by
personnel AUTHORIZED BY THE MANUFACTURER.
Содержание S220 Pro
Страница 2: ......
Страница 4: ......
Страница 26: ...22 ELECTRICAL DIAGRAM SIG 97 versions 195 220 250 E...
Страница 27: ...23 ELECTRICAL DIAGRAM 97 FA for versions 250 I 300 E 275 I...
Страница 28: ...24 ELECTRICAL DIAGRAM 97 FA for versions 300 I 350 I...
Страница 29: ...25 THREE PHASE ELECTRICAL DIAGRAM 1893 all versions...
Страница 30: ......
Страница 31: ......