13
1.
Place a bracket
D
on the wall as shown about 1/8" from the
ceiling or upper limit, aligning the center (notch) with the
vertical reference line
X
and mark the wall at the centers of the
holes in the bracket.
2.
Place the second bracket
D
on the wall as shown, below the
first bracket, at the height of the upper chimney section
C
supplied and aligning the center (notch) with the vertical line.
3.
Mark the wall at the centers of the holes in the bracket and mark
the point 1 and 2 for the Hood Body installation as shown(12
5/8" from the horizontal line and 4 9/16" from the vertical line).
4.
Drill ø 5/16" holes at all the center points marked (point
1,2,3,4,5,6) as shown.
3
C
D
Содержание STILO SUPREMA STSP30SSV
Страница 6: ...6 RANGE HOOD DIMENSIONS DRAFT 06 30 36...
Страница 7: ...7 INSTALLATION HEIGHT REQUIREMENTS MIN 24 OVER ELECTRIC MIN 30 OVER GAS Min 24 Min 30...
Страница 9: ...9 B A F C D E...
Страница 18: ...18 CHOOSING VENTING METHOD VENTED RECIRCULATING Go to Pg 19 Go to Pg 23...
Страница 46: ...46 DIMENSIONS DE LA HOTTE DRAFT 06 30 36...
Страница 47: ...47 EXIGENCES EN MATI RE DE HAUTEUR D INSTALLATION MIN 24 SUR LECTRIQUE MIN 30 SUR GAZ Min 24 Min 30...
Страница 49: ...49 B A F C D E...
Страница 58: ...58 CHOIX DE LA M THODE DE VENTILATION VENTIL RECIRCULATION Allez la page 59 Allez la page 63...
Страница 86: ...86 DIMENSIONES DE LA CAMPANA EXTRACTORA DRAFT 06 30 36...
Страница 87: ...87 REQUISITOS DE ALTURA PARA LA INSTALACI N M N 24 SOBRE EL CTRICO M N 30 SOBRE GAS M n 24 M n 30...
Страница 89: ...89 B A F C D E...
Страница 98: ...98 ELECCI N DEL M TODO DE VENTILACI N VENTILADO RECIRCULACI N Vaya a la P g 99 Vaya a la P g 103...
Страница 122: ......
Страница 123: ......
Страница 124: ...991 0703 908_05 240112 D000000009395_04...