Installation manual MatriX 1050/500 I,II,III H & MatriX 1050/650 I,II,III H
13 <
<
<
<
We advise using a gas connection directly from the
gas meter to the appliance, with a shut-off valve in
the proximity of the appliance, which must always
be freely accessible. Position the gas connection so
that it is easily accessible for service and the
burner unit can be disassembled at any time.
4.2
Electrical connection
Place a double wall socket 230VAC - 50Hz near the
fire for connecting the HPL module and the con-
troller (control box FAB1806).
See wiring diagram without HPL (fig. 1.5a) or with
HPL (fig. 1.5b):
A = I.T.C. (Intelligent Technical Controller)
B = electronics
C = gas valve
D = solenoid valve
E = step module or HPL module (optional)
F = ignition pin
G = ionization pin
H = connection cable
I = configuration plug
4.3
Smart Home installation
The controller can be connected to an external
source, such as a Domotica system, by using a Fa-
ber Interface Unit (article number A9323000).
4.4
Preparing the fireplace
Remove the fireplace from its packaging.
Ensure that the gas supply pipes under
the appliance are not damaged.
Prepare the gas connection on the gas
valve. Prepare the gas connection on the
gas valve. Provide a flexible gas connec-
tion with at least 0,5m extra length, so
that the control unit can be removed for
installation and service!
4.5
Positioning the fireplace
Take into account the installation requirements
(see chapter 3). Place the fireplace at the right
place and level it.
Rough height adjustment:
With the adjustable (optional) legs.
Accurate height adjustment:
With the adjustable feet.
Hanging on the wall
The fireplace can also be mounted on the wall by
using the optional wall bracket, see attachment
18.9 (article number A9325996).
Therefore remove the existing brackets and use
the supplied spacer for vertical alignment, see fig.
2.0.
4.6
HPL module (Hybrid Pro Light)
Place the power supply (see fig. 1.7) of the
HPL/step module in a cool place and near to the
controller (control box).
Please note!
Before installing the false chimney, a func-
tional test of the HPL module is recom-
mended.
Physical check HPL module
Switch on the HPL module with the remote control
and check whether the LED spots are on (fig. 1.8).
Electronic check HPL module in the ITC-V2 App
(Only possible in dealer setting).
Make sure the ITC-V2 App is connected to the fire,
see fig. 1.9a.
1.
Switch on the glow effect, see fig. 1.9b.
2.
Navigate to:
Menu (top left) -> Diagnostics -> Realtime
Monitor -> HPL MODULE.
3.
Click on “TEST LED SPOTS”, see fig. 1.9c.
If any LED spots are defective, this will be indicated
in the App. Use the overview in section 16.1 for the
position.
Testing burner sections (step valves)
1.
Activate the sectional burner by clicking at
the "step symbol", see fig. 1.9d.
2.
Switch the various modes, see fig. 1.9e.
If a step valve is defective, this will be indicated in
the App.
4.7
Installing the flue pipes
Install the flue pipes according to the installation
manual supplied with the appliance (40011968)!
The distance to combustible materials
must be min. 50mm, calculated from the
outside of the flue pipe.
Never start immediately with an adjusta-
ble flue pipe on the appliance.
Horizontal sections should be installed to
allow a slope towards the appliance
(3 degrees).
Built the system from the appliance. If this
is not possible you can make use of an ad-
justable flue pipe.
For fitting of the flue system, the 0,5m
length-adjustable pipe must be used.
Make sure that the inner pipe is always
15mm longer than the outer pipe. Wall-
and roof terminal can also be cut. These
components must be secured with a self-
tapping screw.
Содержание MatriX 1050/500 I
Страница 1: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H ENG 40012085 2223 ...
Страница 2: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 2 ...
Страница 3: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 3 ...
Страница 4: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 4 1 0 1 1 1 3 1 2 1 4 ...
Страница 9: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 9 3 9 4 0 4 1 ...
Страница 10: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 10 ...
Страница 21: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 21 12 Examples flue material ...
Страница 30: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 30 18 2 MatriX 1050 500 IIL H ...
Страница 31: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 31 18 3 MatriX 1050 500 IIR H ...
Страница 32: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 32 18 4 MatriX 1050 500 III H ...
Страница 33: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 33 18 5 MatriX 1050 650 I H ...
Страница 34: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 34 18 6 MatriX 1050 650 IIL H ...
Страница 35: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 35 18 7 MatriX 1050 650 IIR H ...
Страница 36: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 36 18 8 MatriX 1050 650 III H ...
Страница 38: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 38 18 10 Control box FAB1806 ...
Страница 41: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 41 ...
Страница 42: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 42 ...
Страница 43: ...Installation manual MatriX 1050 500 I II III H MatriX 1050 650 I II III H 43 ...
Страница 44: ...www faberfires com contact faberfires com Saturnus 8 NL 8448 CC Heerenveen Postbus 219 NL 8440 AE Heerenveen ...