![Faber Levante II Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/faber/levante-ii/levante-ii_installation-instructions-manual_3693747012.webp)
12
5HPRYHWKH´OWHUVRQHDW
a time by pushing them
towards the back of the
hood and pulling down at
the same time.
Remove the wiring box
cover by unscrewing
the 2 screws.
Preparing the hood for electrical knockouts
7" 1/2
13/16"
13/16"
CHOOSE VERTICAL OR HORIZONTAL
ELECTRICAL CONNECTION KNOCKOUT'S
1
2
Phillips Screwdriver
=
Содержание Levante II
Страница 6: ...6 RANGE HOOD DIMENSIONS 3 29 15 16 35 15 16 30 36 30 36...
Страница 7: ...7 MIN 24 OVER ELECTRIC MIN 30 OVER GAS INSTALLATION HEIGHT REQUIREMENTS Min 24 30...
Страница 39: ...39 DIMENSIONS DE LA HOTTE 3 29 15 16 35 15 16 30 36 30 36...
Страница 72: ...72 3 29 15 16 35 15 16 30 36 30 36 DIMENSIONES DE LA CAMPANA DE COCINA...
Страница 73: ...73 Min 24 Min 30 M N 24 SOBRE PLACA EL CTRICA M N 30 SOBRE PLACA DE GAS REQUISITOS DE ALTURA DE LA INSTALACI N...
Страница 100: ...991 0675 523_01 220302 D00008478_00...