3.4 DUCTS SET-UP
Before carrying out the required masonry works, make sure all necessary ducts for the passage of the cables (electrical and
data connection) are prepared.
It is essential to provide separate channels between: mains voltage (230 Vac power cables) and low
voltage (cables for: control, safety, intercoms, serial data line, etc.).
13
1
14
2 3 4
8
9
7
10
11
12
5
6
5
Figure 10 -
Channelling Diagram for entry lane
It is also necessary to appropriately size the diameter of the cable ducts to be installed, in relation to the section and the
number of cables to be inserted.
Pos. Type
Device
Type of cable
Section
1
Power Supply (Vac)
Peripheral
Flame-retardant
2 x 1.5 mm
2
+ earth
2
Data
Peripheral
RS485:
Twisted pair and shielded
(eg. Belden 9841 or Ceam
09842)
2 x 0,25 mm
2
TCP/IP:
UTP cat.5 or higher
8 x 0,2 mm
2
3
Data
Intercom System (Analog/
VOIP)
Analog:
Twisted pair
0,4 mm
2
(275 Ω/Km)
0,6 mm
2
(122 Ω/Km)
TCP/IP:
UTP cat.5 or higher
8 x 0,2 mm
2
4
Data
Graphic display manage-
ment Board
TCP/IP:
UTP cat.5 or higher
8 x 0,2 mm
2
5
Connection
Magnetic loops
Unipolar
1,5 mm
2
6
Connection
Commands Barrier
Flame-retardant
4 x 0.5 mm
2
7
Power Supply (Vac)
Barrier
Flame-retardant
2 x 1.5 mm
2
+ earth
8
Connection
AVI Reader
Flame-retardant
3 x 0.5 mm
2
9
Power Supply (Vdc)
AVI Reader
Flame-retardant
2 x 1.5 mm
2
+ earth
10
Connection
LPR Camera (Trigger)
Flame-retardant
2 x 0.5 mm
2
Ver. 1.0 - 21st Nov. 2014 - ENG
Содержание PARQUBE LE
Страница 1: ...PARQUBE LE Installation Ver 1 0 21st Nov 2014 ENG ...
Страница 2: ......
Страница 3: ...3 This page has been left blank intentionally Ver 1 0 21st Nov 2014 ENG ...
Страница 6: ...6 This page has been left blank intentionally Ver 1 0 21st Nov 2014 ENG ...
Страница 10: ...10 This page has been left blank intentionally Ver 1 0 21st Nov 2014 ENG ...
Страница 40: ...HUB Parking Technology a Business Unit of the FAAC Group www hubparking com ...