![FAAC DAAB DB512 Скачать руководство пользователя страница 3](http://html2.mh-extra.com/html/faac/daab-db512/daab-db512_instruction-manual_4878678003.webp)
DAAB COMMUNICATION CARD DB512 INSTRUCTION MANUAL
Revision 1
3
Connection
To optimise communication between two EP105s, it is important to choose the right cable and to route it correctly. A
suitable cable is FQAR-PG 2X0,5, E0182120. Otherwise use a twisted pair shielded cable with a conductor cross sectional
area of at least 0.2 mm
2
and a capacitance of 50-70 pF/m.
Connect the shield at one end onlyto DB512 terminal 1. At the other hand, trim off the shield after the cable insulation.
The cable length must not exceed 1000 metres.
Connection must be performed by a qualified technician.
When the card has been installed and connected, the power supply to EP105 can be switched
on.
EP105
DB512
3 2 1
EP105
DB512
3 2 1
Shield
Содержание DAAB DB512
Страница 6: ......