manualshive.com logo in svg
background image

4

Fig. 3

Fig. 2

ENGLISH

Dimensions in mm

Operator
Flashing lamp
2easy-BUS Photocells
Conventional photo-

cells
Key-operated control

1.
2.
3.
4.

5.

5  INSTALLATION OF AUTOMATED SYSTEM 

5.1  PRELIMINARY CHECKS

To ensure safety and an efficiently operating automated system, make sure the following conditions are observed:

The gate structure must be suitable for automation. The following are necessary in particular: wheel diameter must be in 

proportion to the weight of the gate to be automated, an upper guide must be provided, plus mechanical limit switches to 

prevent the gate derailing.
The gate slide track must be linear and horizontal.
Manual movement of the gate must be easy throughout its travel.
The soil must permit sufficient stability for the foundation plinth.
There must be no pipes or electric cables in the plinth excavation area. 
If the gearmotor is exposed to passing vehicles, install, if possible, adequate means of protection against accidental im-

pact.
Check if an efficient earthing is available for connection to the gearmotor.

If the elements checked do not meet the above requirements, arrange to ensure their compliance.





3  DIMENSIONS

4  ELECTRIC EQUIPMENT (standard system)

The dimensions and electrical preparations (standard system) are the same for operator C720 and for 

operator C721

www.metalines.com

[email protected]

Содержание C721

Страница 1: ...C720 C721 C720 C721 www metalines com sales metalines com...

Страница 2: ...cified in the Standards indicated at point 10 16 The safety devices EN 12978 standard protect any danger areas against mechanical movement Risks such as crushing dragging and shearing 17 Use of at lea...

Страница 3: ...N 6 5 4 INSTALLING THE RACK 7 5 4 1 STEEL RACK TO WELD Fig 11 7 5 4 3 NYLON RACK TO SCREW Fig 13 7 5 4 2 STEEL RACK TO SCREW Fig 12 7 6 OPERATIONAL START UP 8 6 1 ELECTRONIC BOARD CONNECTION 8 6 1 1 E...

Страница 4: ...are not installed or if the operator is not in service Cover casing Motor lock Link cover Motor release handle Transformer Foundation plate Cable passage holes Pinion and pinion cover Electronic boar...

Страница 5: ...te derailing The gate slide track must be linear and horizontal Manual movement of the gate must be easy throughout its travel The soil must permit sufficient stability for the foundation plinth There...

Страница 6: ...sure Dimensions in mm This symbol must always face to wards the gate Prepare a foundation plinth as shown in Fig 7 and wall in the foundation plate supplying one or more sheaths for routing electric c...

Страница 7: ...he height of the gearmotor and the distance from the gate with reference to the dimensions in Fig 10 Operation required for correct fastening of the rack and to keep open the option of new adjustments...

Страница 8: ...he slot In this way the slot play will enable any adjustments to be made Mark the drilling point on the gate Drill a 6 5 mm hole and apply thread with a 8 mm male tap Screw the bolt Move the gate manu...

Страница 9: ...ramming mainte nance always turn off power Observe points 10 11 12 13 14 of the GENERAL SAFETY OBLIGATIONS Follow the instructions in Fig 3 to arrange the cables in the ducts and make the electrical c...

Страница 10: ...must be left from the mechanical limit switches 7 TESTING THE AUTOMATED SYSTEM Once the operator has been installed carry out a thorough operational check of all accessories and connected safety devi...

Страница 11: ...orce which must comply with current standards and of the release devices 10 REPAIR Contact an authorised Repair Centre for repairs 11 ACCESSORIES 11 1 BATTERY KIT Install the battery kit as shown in F...

Страница 12: ...d pause time If semi automatic operating mode has been selected a second pulse must be sent to re close the gate An opening pulse issued during the re closing stage always causes a reversal of motion...

Страница 13: ...endem Handbuch sind unverbindlich FAAC beh lt sich das Recht vor ohne die wesentlichen Eigenschaften dieses Ger tes zu ver ndern und ohne Verbindlichkeiten in Bezug auf die Neufassung der vorliegenden...

Отзывы: