manualshive.com logo in svg
background image

4

105

1015

L

LP=L-105

25

105,3

90

A

A

Sez. A-A

85

5

3x0,5

mm

2

2x0,5

mm

2

2x0,5

mm

2

2x1,5

mm

2

3x0,5

mm

2

2x1,5

mm

2

2x1,5

mm

2

3X1,5mm

2

230V~

6

6

2

3

4

2

1

300 mm

250 mm

250 mm

400 mm

5 mm

=

=

==

 loop 

detector

ENGLISH

fig.2

fig.3

fig.4

 

Operator 615BPR

 Photocells

 Key-operated 

push-button

 Flashing 

lamp

 Receiver

To ensure safety and an efficiently operating automated 

system, make sure the following conditions are observed:

  When moving, the beam must not, on any account, 

meet any obstacles or overhead power cables.

  The soil must permit sufficient stability for the foundation 

plinth.

  There must be no pipes or electrical cables in the plinth 

excavation area.

  If the barrier body is exposed to passing vehicles, install, 

if possible, adequate means of protection against 

accidental impact.

  1)  To lay cables, use adequate rigid and/or flexible

  tubes

 

 

2)  Always separate connection cables of low voltage 

 

 

 

accessories from those operating at 230v~. To prevent

 

 

any interference whatever, use separate sheaths.

2. ELECTRIC PREPARATIONS (standard system)

3 DIMENSIONS

Dimensions are in mm.

4.1 PRELIMINARY CHECKS

4 INSTALLING THE AUTOMATED SYSTEM

4.2 MASONRY FOR FOUNDATION PLATE

4.3 INSTALLING THE UPRIGHT

4.4 INSTALLING THE BEAM

 

  The 615BPR automated system is always supplied 

 

in the right-hand version – for left-hand installation,

 

see chapter 5.5

.                                              

1)  Make sure that the rod of the piston secured to the rocker 

is completely extended (corresponding to the beam’s 

vertical position).

2)  Remove and store the breather screw as shown in fig.6
3)  Assemble the bar as in fig.7a for the rectangular 

version,  or  as  in  fig.7b  for  the  round  version.                                                                                            

                                                                                                 

1)  Remove the cover, unscrewing the screws securing it to 

the upright.

2)   Using the four nuts and washers supplied, secure the 

upright on the foundation plate as shown in fig.5

 

Remember that the hatch of the upright should normally 

face the building.

1)  Check if the balancing spring matches the type of beam 

installed: see chapter 5.

2)  While keeping the beam in vertical position, assemble 

the tie rod and spring as shown in fig.8

3)  Release the operator (see chapter 7) and position the 

beam at 45°, then adjust the tie-rod and set the spring until 

the weight of the beam is balanced in that position.                                                                   

4)    Restore normal operation as described in chapter 7.

4.5 INSTALLING AND ADJUSTING THE BALANCING  

         SPRING

1)  Make a foundation plate as shown in fig.4 (referred to 

clayey soil)

2)  Wall the foundation plate as shown in fig.4, supplying 

one or more sheaths for routing electrical cables. Using a 

spirit level, check if the plate is perfectly level. Wait for the 

cement to set.

Содержание 615

Страница 1: ...615 615...

Страница 2: ...ur les remarques concernant les caract ristiques ou le fonctionnement du produit Vor der Installation des Produkts sind die Anweisungen vollst ndig zu lesen Mit dem Symbol sind wichtige Anmerkungen f...

Страница 3: ...4 INSTALLING THE AUTOMATED SYSTEM 4 4 1 PRELIMINARY CHECKS 4 4 2 MASONRY FOR FOUNDATION PLATE 4 4 3 INSTALLING THE UPRIGHT 4 4 4 INSTALLING THE BEAM 4 4 5 INSTALLING AND ADJUSTING THE BALANCING SPRIN...

Страница 4: ...osing elements to be motorised or for any defor mation that may occur during use 10 The installation must conform to Standards EN 12453 and EN 12445 For non EU countries to obtain an adequate level of...

Страница 5: ...cycle opening closing pause times Calculation formula where Ta opening time Tc closing time Tp pause time Ti interval time between onecompletecycleand another foundation plate barrier upright control...

Страница 6: ...3 INSTALLING THE UPRIGHT 4 4 INSTALLING THE BEAM The 615BPR automated system is always supplied intheright handversion forleft handinstallation see chapter 5 5 1 Makesurethattherodofthepistonsecuredt...

Страница 7: ...5 ENGLISH fig 7b fig 5 fig 7a IMPORTANT moderatelytightenthe pocket securing screw max 30Nm fig 6 fig 8 IMPORTANT moderatelytightenthepocketsecuring screw max 30Nm...

Страница 8: ...g for the beam which must be ordered separately The spring varies according to length and type of beam rigid skirt or articulated Consult the tables below to see if the spring matches 5 BALANCING SPRI...

Страница 9: ...11 ref 1 Fit the standard triangular key Fig 13 in the lock and turn it anti clockwise through 1 turn Open and close the barrier manually To prevent an involuntary impulse from activating the barrier...

Страница 10: ...pring must be adapted FORK SUPPORT fig 15 The fork has two functions itpreventsthebeam whenclosed frombendingorsplitting if its end is stressed by extraneous forces it allows the beam to rest when clo...

Страница 11: ...in vorliegendem Handbuch sind unverbindlich FAAC beh lt sich das Recht vor ohne die wesentlichen Eigenschaften dieses Ger tes zu ver ndern und ohne Verbindlichkeiten in Bezug auf die Neufassung der v...

Отзывы: