
Installing the cable managers
The chassis includes two cable managers. You can install one or both cable managers onto the front of the
chassis, above or below the blade slots. The cable managers are not directional.
Secure the cable managers in the desired position by tightening the screws clockwise.
There are installation holes provided in the pre-installed rack mount brackets.
Using the cable managers
The cable managers and included hook-and-loop tie straps help organize the cabling for the blades installed
in the chassis.
To organize the cables, guide the cables through the C hooks, leaving some service loop so that the cable
manager can be tilted.
The cable managers come with hook-and-loop tie straps that you can use to secure the cables. The straps
loop through the slots in between the C hooks.
42
Platform Installation
Содержание VIPRION 4800 Series
Страница 1: ...Platform Guide VIPRION 4800 Series MAN 0423 05 ...
Страница 2: ......
Страница 6: ...Legal Notices 103 Legal Notices 103 6 Table of Contents ...
Страница 76: ...Figure 21 Airflow in the VIPRION 4800 platform 76 Environmental Guidelines ...
Страница 86: ......
Страница 88: ...88 China RoHS Requirements ...
Страница 89: ...89 Platform Guide VIPRION 4800 Series ...
Страница 90: ...90 China RoHS Requirements ...
Страница 94: ...94 Repackaging Guidelines ...
Страница 97: ...10 Close and seal the outer shipping box 97 Platform Guide VIPRION 4800 Series ...
Страница 98: ......
Страница 102: ......
Страница 109: ...W warnings warnings continued environmental 71 109 Index ...
Страница 110: ...110 Index ...