ATR833A / P/N 833A-(xxx)-(1xx)
Operation and Installation
30
Dokument-Nr.: 01.1411.010.71e / Revision: 3.00
4.4 Unpacking and Inspecting the Equipment
Carefully unpack the equipment. Damages due to transportation must be
reported to the shipping company immediately. Save the shipping
container and all packing materials to substantiate your claim
4.5 Mounting
•
In cooperation with a maintenance shop, location and kind of the
installation are specified. The maintenance shop can supply all
cables. Suitable sets of cables are available from f.u.n.k.e.
AVIONICS GmbH.
•
Select a position away from heat sources. Care for adequate
convection cooling.
•
Leave sufficient space for the installation of cables and connectors.
•
Avoid sharp bends and wiring close to control cables.
•
Leave sufficient lead length for inspection or repair of the wiring of
the connector.
•
Bend the harness at the rear connectors to inhibit water droplets
(formed due to condensation) from collecting in the connector.
•
For mounting details/drawing refer to chapter 4.12.2 Mounting
Advices.
For storage or reshipment the original packaging should be
used.
Содержание ATR833A-OLED
Страница 2: ......
Страница 48: ...ATR833A P N 833A xxx 1xx Operation and Installation 47 Dokument Nr 01 1411 010 71e Revision 3 00 Notes ...
Страница 49: ...ATR833A P N 833A xxx 1xx Operation and Installation 48 Dokument Nr 01 1411 010 71e Revision 3 00 ...
Страница 50: ...ATR833A P N 833A xxx 1xx Operation and Installation 49 Dokument Nr 01 1411 010 71e Revision 3 00 ...
Страница 51: ......