background image

Step 3 - Cut out a section of pipe

 slightly larger than the cut out length of the ball valve 

coupling.  Determine the length of the cutout by measuring the length from socket to socket 
inside the ball valve coupling.  If the space for the coupling is cut too large it may prevent the 
pipe and the coupling from forming a solid seal.  (Unions may be used for easier retrofit 
installations.) 

Step 4 - Glue the ball valve coupling

 

into the line. The pipe should fit into both ends of 

the ball valve coupling and seat against the ball valve coupling socket.  Be sure that the blue 
fitting is closer to the back flow preventer than the green fitting and that the flow direction of 
the water matches the flow direction arrow on the side of the ball valve coupling.  

Step 5 - Attach tubing

 to the ball valve coupling.  Press the black tube over the 

blue fitting on the ball valve coupling. Press the clear tube over the green fitting on 
the ball valve coupling.  Put tubing clamps over the tubing below the barbed end of 
the fitting and squeeze them until they are tightly secured.

CUTOUT
LENGTH

GLUE IN
BALL VALVE 
COUPLING

CUT 
PIPE

CUTOUT
LENGTH

3

SOCKET

FLOW

SOCKET

BLUE

GREEN

FLOW

ATTACH TUBING
& TUBING CLAMPS

CLEAR TUBING TO GREEN FITTING
BLACK TUBING TO BLUE FITTING

BLUE

GREEN

FLOW

© 2014, EZ-FLO    Fertilizing Systems                          www.ezflofertilizing.com

TM

Отзывы: