Main Line Connection
Sold separately
* Calibrating the CBV connection is on subsequent pages.
Glue in coupling with flow
arrow pointing in the direction
of the water flow
3
Cut out a section of pipe
Slightly larger than the cut out length of the coupling.
4
Glue the coupling into the line
5
Attach tubing to the coupling
Attach black tubing to blue fitting,
clear tubing to green fitting and
secure with tubing clamps
F L O W
Cutout length
Cutout
length
Ball Valve Coupling
Flow
FLOW
FLOW
FLOW
green
green
blue
blue
optional
Cut
pipe
Page
5
www
.ezflo.com.a
u
TM
© 2020, EZ-FLO Fertilizing Systems