Chapter 4: Preinstallation checklist

Before you install the VSP 4450GTX-HT-PWR+, make sure that you complete the tasks in the

preinstallation checklist.

No.

Task

Description

1.

Review the technical specification for
the switch. Make sure that the area
where you install the switch and where
it will operate meet the requirements.

For the physical, electrical, and environmental
specifications, see 

Technical specifications

 on

page 19.

2.

Verify the power supply unit (PSU)
specifications. Optionally order a
redundant PSU to provide redundancy
and load sharing.

See 

AC power supply specifications

 on

page 29.

To order redundant PSUs, see 

Hardware

models

 on page 10 for part numbers.

3.

Make sure that you have the following
tools and cables:

• Phillips #2 screwdriver

• RJ45 console port cable

• ESD cable

See 

Cable requirements for the VSP 4000

 on

page 24.

4.

Unpack the equipment.

Observe ESD precautions when you unpack
the equipment. See 

Electrostatic discharge

 on

page 17.

5.

Verify the contents of the shipped
package.

See 

Package contents

 on page 20 for a

description of the components that are
provided with the switch. If any components
are missing, contact Extreme Networks
support.

6.

Make sure that the power cord has the
correct country-specific termination.

7.

Prepare the rack.

Ensure that there is enough rack space to
accommodate a 2RU switch (8.8 cm).

Ensure that the rack is bolted to the floor and
braced if necessary.

Ensure that the rack is grounded to the same
grounding electrode used by the power service

Table continues…

August 2018

Installing the Virtual Services Platform 4450GTX-HT-PWR+

14

Содержание EC4400A03-E6

Страница 1: ...Installing the Virtual Services Platform 4450GTX HT PWR 9035362 Rev 02 August 2018...

Страница 2: ...HE TERMS OF USE IF YOU ARE ACCEPTING THE TERMS OF USE ON BEHALF A COMPANY OR OTHER LEGAL ENTITY YOU REPRESENT THAT YOU HAVE THE AUTHORITY TO BIND SUCH ENTITY TO THESE TERMS OF USE IF YOU DO NOT HAVE S...

Страница 3: ...ER IS HOSTING ANY PRODUCTS THAT USE OR EMBED THE G 729 CODEC H 264 CODEC OR H 265 CODEC THE EXTREME NETWORKS CHANNEL PARTNER ACKNOWLEDGES AND AGREES THE EXTREME NETWORKS CHANNEL PARTNER IS RESPONSIBLE...

Страница 4: ...cal specifications 19 Environmental requirements 19 Airflow direction 20 Package contents 20 Installing the Virtual Services Platform 4000 on a table or shelf 21 Installing the Virtual Services Platfo...

Страница 5: ...ED state indicators 33 Port LED state indicators 34 Viewing hardware information 36 Chapter 6 Translations of safety messages 39 Contents August 2018 Installing the Virtual Services Platform 4450GTX H...

Страница 6: ...as for improvements to our documentation so you can find the information you need faster Broken links or usability issues If you would like to provide feedback to the Extreme Networks Information Deve...

Страница 7: ...on of your network environment such as layout cable type other relevant environmental information Network load at the time of trouble if known The device history for example if you have returned the d...

Страница 8: ...pe your first and last name 3 Type the name of your company 4 Type your email address 5 Type your job title 6 Select the industry in which your company operates 7 Confirm your geographic information i...

Страница 9: ...2 New in this document There are no feature related changes for this release in Installing the Virtual Services Platform 4450GTX HT PWR August 2018 Installing the Virtual Services Platform 4450GTX HT...

Страница 10: ...e 11 Management port Extreme Networks Virtual Services Platform 4000 Series requires one port to be configured as the management port This port separates user traffic from management traffic in highly...

Страница 11: ...the correct power cord for your region For more information see Power cord types and order codes on page 11 Table 2 Power supply order codes VSP 4000 PSU Usage Part number order code 1000W AC POE pow...

Страница 12: ...switch as they are certified and qualified as high temperature devices However if you use a non high temperature SFP device the device is logged as an unsupported high temperature device Extreme Netw...

Страница 13: ...orks does not provide support for operational issues related to these transceivers but they will operate and the port link will come up The switch logs the device as an unsupported or unknown device F...

Страница 14: ...ave the following tools and cables Phillips 2 screwdriver RJ45 console port cable ESD cable See Cable requirements for the VSP 4000 on page 24 4 Unpack the equipment Observe ESD precautions when you u...

Страница 15: ...escription in the area The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack to the grounding electrode August 2018 Installing the Virtual Services Platform 4450GTX H...

Страница 16: ...tion of AC input and DC input power supplies in the same chassis is not supported For the procedure to install power supply see Installing the VSP 4000 Series PWR power supply on page 27 3 Check the L...

Страница 17: ...age Electrostatic discharge ESD is a discharge of stored static electricity that can damage equipment and impair electrical circuitry Electrostatic voltages can result from friction including pulling...

Страница 18: ...able installations With new cable installations you are recommended to use an ESD discharge cable to reduce the potential for damage from static that can build up in cables The following figure illust...

Страница 19: ...switches in this series Ensure that the area where you install the switch and where it operates meets these requirements Table 6 Virtual Services Platform 4000 environmental requirements Environmental...

Страница 20: ...page 39 Airflow direction The airflow direction in the VSP 4450GTX HT PWR for the top half of the switch where the components exist is from left to right as viewed from the front Cool air enters the...

Страница 21: ...orm 4000 on a table or shelf You can install a single VSP 4000 switch on any flat surface The surface must support the combined weight of the switch and attached cables from 15 and 20 pounds 7 to 9 ki...

Страница 22: ...e used by the power service in the area The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack to the grounding electrode Caution When you mount the device in a rack d...

Страница 23: ...itch into the rack as illustrated 3 Insert and tighten the rack mount screws Installing the Virtual Services Platform 4000 in an equipment rack August 2018 Installing the Virtual Services Platform 445...

Страница 24: ...orted in SFP ports only and not in SFP ports Console Port Varies depending on the user device The VSP 4000 has an RJ45 female connector so a serial cable with RJ45 connectors or a serial cable with a...

Страница 25: ...rforming this procedure 1 Disconnect the network fiber cable from the transceiver 2 Use the locking mechanism on the transceiver to release it The locking mechanism varies from model to model as illus...

Страница 26: ...ot used 2 Transmit Data TXD 3 Receive Data RXD 4 Data terminal ready not used 5 Signal ground GND 6 Not used 7 Request to send not used 8 Not used 9 Ring indicator not used Table 9 RJ45 Console port p...

Страница 27: ...d in the slot Secure the power supply with the two thumb screws Note The switch chassis can prevent an incorrect installation of a power supply If you insert a power supply upside down it will not ful...

Страница 28: ...Connector The 1000W AC power supply uses an IEC 60320 C16 AC power cord connector The AC power cord is in close proximity to the hot air exhaust and supports high operating temperatures Figure 4 IEC 6...

Страница 29: ...r specifications are based on the maximum rated capacity of the power supplies and are not based on typical power consumption which is lower Table 13 AC power specifications 4450GTX HT PWR Input Curre...

Страница 30: ...50 60 Hz Single phase United Kingdom BS1363 male plug with fuse Harmonized cord 240VAC 50 Hz Single phase Australia AS3112 1981 male plug 240VAC 50 Hz Single phase Danger Using power cords with a pro...

Страница 31: ...ys perform the following shutdown procedure This procedure flushes any pending data to ensure data integrity 1 Enter the Privileged EXEC command mode enable 2 Shutdown the VSP 4000 sys shutdown 3 When...

Страница 32: ...c mounts No such file or directory Deconfiguring network interfaces done Stopping syslogd klogd no syslogd found none killed Sending all processes the TERM signal Sending all processes the KILL signal...

Страница 33: ...emit laser or infrared light that can injure your eyes Never look into an optical fiber or connector port Always assume that fiber optic cables are connected to a light source For a translation of th...

Страница 34: ...en blinking The switch is connected to a secondary power supply but the power input is disconnected Amber solid The power supply in slot 1 or slot 2 was removed after operating Amber blinking The powe...

Страница 35: ...P transceiver Port LED state indicators Label Color and Status Description In Use Green Blink Not applicable Green Steady The SFP SFP port and the transmit port are active Amber Blink Not applicable A...

Страница 36: ...Name VSP 4450GTXHT PWR SysUpTime 0 day s 00 05 40 SysContact http www extremenetworks com contact SysLocation 9 Northeastern Blvd Salem NH 03079 Chassis Info Chassis 4450GTXHT PWR ModelName 4450GTXHT...

Страница 37: ...s Trap false Send Authentication Trap false Error Code 0 Error Severity 0 Port Lock Info Status off LockedPorts Message Control Info Action suppress msg Control Interval 5 Max msg num 5 Status disable...

Страница 38: ...Displays LED information in detail power Displays information about installed power supplies temperature Displays temperature information uboot Displays uboot details Installing the VSP 4450GTX HT PW...

Страница 39: ...baie ne l empilez pas directement sur un autre Chaque module doit tre fix sa propre baie l aide des supports de montage appropri s Ces supports ne sont pas con us pour r sister plusieurs modules Impor...

Страница 40: ...ns une baie veillez laisser la plaque m tallique sur la baie Si vous la retirez l a ration du module ne peut pas s effectuer correctement Important Precaution Si no instala ning n m dulo en la ranura...

Страница 41: ...der facilement en cas d urgence Important Advertencia Para apagar el dispositivo debe desenchufar el cable Conecte siempre el cable de alimentaci n a una toma segura y de f cil acceso por si se produ...

Страница 42: ...messa a terra Senza un adeguata messa a terra chiunque tocchi lo switch corre il rischio di ricevere una scossa elettrica L assenza di un percorso per la messa a terra verso lo switch pu comportare u...

Страница 43: ...t cnico de Extreme Networks si necesita asistencia para cambiar la bater a Important Aviso A bateria de l tio n o substitu vel em campo S deve ser removida e substitu da por pessoal autorizado Entre...

Отзывы: