36
Extreme Networks Consolidated Hardware Guide
Site Preparation
Planning Your Site
To install your equipment successfully, you should plan your site carefully. The site planning process
has three major steps:
Step 1: Meeting Site Requirements
Your physical installation site must meet several requirements for a safe and successful installation:
•
Building and electrical code requirements
•
Environmental, safety, and thermal requirements for the equipment you plan to install
•
Distribution rack requirements
Step 2: Evaluating and Meeting Cable Requirements
After examining your physical site and ensuring all environment requirements are met, you should
evaluate and compare your existing cable plant with the requirements of the Extreme Networks
equipment to determine if you need to install new cables (or cabling).
Step 3: Meeting Power Requirements
To run your equipment safely, you must meet the specific power requirements for the Extreme
Networks equipment that you plan to install.
NOTE
Review and follow the safety information before you install your equipment.
Meeting Site Requirements
This section addresses the various requirements to consider when preparing your installation site,
including:
•
Operating Environment Requirements
•
Rack Specifications and Recommendations
Operating Environment Requirements
You need to verify that your site meets all environmental and safety requirements.
Virtually all areas of the United States are regulated by building codes and standards. During the early
planning stages of installing or modifying your LAN, it is important that you develop a thorough
understanding of the regulations that pertain to your location and industry.
Building and Electrical Codes
Building and electrical codes vary depending on your location. Comply with all code specifications
when planning your site and installing cable. The following sections are provided as a resource to
obtain additional information.
Содержание Alpine 3802
Страница 17: ...Part 1 Common Features ...
Страница 18: ......
Страница 32: ...32 Extreme Networks Consolidated Hardware Guide Summary of Common Switch Features ...
Страница 33: ...Part 2 Site Planning ...
Страница 34: ......
Страница 56: ...56 Extreme Networks Consolidated Hardware Guide Site Preparation ...
Страница 57: ...Part 3 Summit Switch ...
Страница 58: ......
Страница 104: ...104 Extreme Networks Consolidated Hardware Guide Summit Switch Models ...
Страница 114: ...114 Extreme Networks Consolidated Hardware Guide Summit Switch Installation ...
Страница 115: ...Part 4 Alpine Switch ...
Страница 116: ......
Страница 122: ...122 Extreme Networks Consolidated Hardware Guide Alpine 3800 Series Switch Overview ...
Страница 152: ...152 Extreme Networks Consolidated Hardware Guide Alpine 3800 Series Switch Power Supplies ...
Страница 158: ...158 Extreme Networks Consolidated Hardware Guide Alpine 3800 Series Switch Management Module ...
Страница 188: ...188 Extreme Networks Consolidated Hardware Guide Alpine 3800 Series I O Modules ...
Страница 194: ...194 Extreme Networks Consolidated Hardware Guide Alpine 3800 Series Switch Fan Tray ...
Страница 195: ...Part 5 BlackDiamond Switch ...
Страница 196: ......
Страница 202: ...202 Extreme Networks Consolidated Hardware Guide BlackDiamond 6800 Series Switch Overview ...
Страница 218: ...218 Extreme Networks Consolidated Hardware Guide BlackDiamond 6800 Series Switch Chassis ...
Страница 232: ...232 Extreme Networks Consolidated Hardware Guide BlackDiamond 6800 Series Switch Power Supplies ...
Страница 282: ...282 Extreme Networks Consolidated Hardware Guide BlackDiamond 6800 Series I O Modules ...
Страница 290: ...290 Extreme Networks Consolidated Hardware Guide BlackDiamond 6800 Series Switch Fan Tray ...
Страница 291: ...Part 6 Switch Operation ...
Страница 292: ......
Страница 296: ...296 Extreme Networks Consolidated Hardware Guide Initial Switch and Management Access ...
Страница 297: ...Part 7 Appendixes ...
Страница 298: ......
Страница 340: ...340 Extreme Networks Consolidated Hardware Guide Module Technical Specifications ...