Install the end linking panels. The bottom of the panel
will slot into place against the wall of the first unit.
Affix by using x4 19mm bolts, washers and captive nuts
– HAND TIGHTEN ONLY.
Repeat the process for both sides.
STEP
3
Install main ceiling linking beam. From the inside of the
units, manoeuvre the linking beam and slot in place,
aligning the pins with the holes at either end.
STEP
4
Expandakabin & Expandacom Linking Kit Assembly Instructions V1