MOUNTING THE COVERING
43
Chapter 6
hoisting upper ring (fi gure 6.2)
1.
side handle clean smokes turner (fi gure 6.3)
2.
lower and upper door micro switch (fi gure 6.3 and 6.4)
3.
shell and tube cleaning door (fi gure 6.5)
4.
Also pay particular attention to the cables relating to the two micro switches which will
have to remain outside the covering shell to avoid over-heating.
fi gure 6.2
fi gure 6.3
fi gure 6.4
fi gure 6.5
Содержание TERMOPELLET TC30
Страница 2: ...2...
Страница 4: ...4 Chapter 8 BOILER MOBILE ACCESSORIES 52 Chapter 9 FINAL CHECK 54...
Страница 39: ...CONNECTION TO ELECTRICAL PLANT 39 Chapter 5 figure 5 2...
Страница 55: ...55 Notes...