17
System Connections
•
A to B.
Connect the
RED
tube into the feed adapter
(point A)
and to the inlet
marked as
“in”
of the leak detector
(point B).
•
C to D.
Connect the
WHITE
tubing to first stage housing
(point D)
to the
outlet marked as
“out”
of the leak detector
(point C).
•
F to E.
Connect the
RED
tubing from the Automatic Shut Off Valve
(point F)
to
the 3rd stage housing
(point E)
.
•
G to H.
Connect the
BLACK
tubing from the Drain Saddle Valve
(point H)
to the Flow Restrictor marked as “to drain”
(point G)
.
•
J to I.
Connect the
YELLOW
tubing from the storage-tank
(point J)
to the post
carbon inline tee
(point I).
•
L to K.
Connect the blue tubing from the faucet
(point L)
to the end of the post
inline carbon marked as “to faucet”
(point K).
1/4” Yellow Tubing to Tank
1/4” Blue Tubing
to Faucet
A
B
C
D
E
F
G
H
I
J
K
L
1/4” Black Tubing
to Drain
1/4” White Tubing
from Leak S
topper
1/4” Red Tubing
from Feed
Содержание Alkaline RO
Страница 1: ...Alkaline RO System INSTALLATION MANUAL 1 800 992 8876 Customer Support ...
Страница 6: ...6 ...
Страница 7: ...Quick Connect Guide 7 ...
Страница 14: ...14 Installation Step 6 RO Faucet If Applied ...