Note that the timer would also eliminate power from the heaters and the 
hydraulic pump during the cooling cycle.   

  

 
 
F. 

Fill the test cylinder with water by positioning the water supply valve to the "FILL CELL" 
position.  Water will flow into the test cell and air will be expelled from the loosened 
thermocouple connection. When water begins to flow from the thermocouple 
connection, tighten the thermocouple gland with a wrench.  When water begins to flow 
from the fitting on the test cell cap tighten the fitting.   

 
G. 

Apply pressure to the test cylinder by turning the "PUMP" switch to the "ON" position.  
The pressure may then be increased by turning the air regulator clockwise until the 
desired pressure is obtained.  This pressure is indicated on the pressure gauge.  
Pressure may be reduced by turning the regulator counter-clockwise and by slightly 
opening the "PRESSURE RELIEF" valve. 

 

APPLY HEAT TO THE TEST CELL  

 
The Eurotherm Model 818 is the most important component of the temperature control 
system and it is strongly recommended that operators carefully study the Model 818 
instruction manual. 
 
A. 

Program the temperature profile you wish to perform into the Model 818 Controller.  

 
B. 

Turn the "HEAT" switch to "ON" to activate the heaters.  

 
 

NOTE THAT THE PRESSURE WILL INCREASE SIGNIFICANTLY DUE TO THE 
THERMAL EXPANSION OF THE WATER AND THE TEST CELL SHOULD BE 
MONITORED CLOSELY UNTIL THE CURING TEMPERATURE IS ACHIEVED.  
SOME OPERATORS SLIGHTLY OPEN THE "PRESSURE RELIEF" VALVE TO 
HELP CONTROL THE PRESSURE DURING HEAT UP.   

 
C. 

The temperature controller will maintain the temperature schedule which was 
programmed and upon termination of a test it is imperative that the "HEATER 
SWITCH" is returned to the "OFF" position.   

 

TERMINATION OF TEST 

 
1. 

After the cement has cured for the required amount of time the "HEAT" switch should 
be turned "OFF". 

 
2. 

Immediately start the cool down procedure by turning the "COOLANT" switch to the 
"ON" position.  DO NOT release the test pressure until the temperature has been 
reduced to a minimum of 200 degrees F. 

 

Содержание 200

Страница 1: ...essure of the test cell is increased via an air driven hydraulic pump Test temperature is governed by a PID temperature controller which actuates the heater After a predetermined amount of time the temperature of the test cell is reduced by the cooling system Specimens are removed and the compressive strength is determined as outlined in API Specification 10 INSTALLATION 1 Carefully remove the ins...

Страница 2: ...Y MOLDS The slurry shall be placed in the prepared molds in a layer equal to one half of the mold depth and puddled 25 times per specimen with a puddling rod The slurry shall be placed in all the specimen compartments before commencing the puddling operation After puddling the layer the remaining slurry shall be stirred by hand using a puddling rod or spatula to eliminate segregation the molds fil...

Страница 3: ...e controller hinges downward 2 Depress the scroll key the right key behind the hinged panel until a parameter appears Continue to press the key until the parameter AL1 appears 3 Press the UP or DOWN arrow keys until the desired high alarm setpoint is obtained 4 Wait approximately 10 seconds and the controller will automatically return to the normal display mode TIMER The Model 200 incorporates a t...

Страница 4: ...urotherm Model 818 is the most important component of the temperature control system and it is strongly recommended that operators carefully study the Model 818 instruction manual A Program the temperature profile you wish to perform into the Model 818 Controller B Turn the HEAT switch to ON to activate the heaters NOTE THAT THE PRESSURE WILL INCREASE SIGNIFICANTLY DUE TO THE THERMAL EXPANSION OF ...

Страница 5: ...tering the test cell Close all valves and return all switches to the OFF position GENERAL MAINTENANCE 1 One of the most important elements concerning trouble free operation is keeping the interior of the test cell as clean as possible Never insert a cement covered cement mold into the test cell and periodically examine the test cell to ensure that it is clean High pressure valves wear quickly when...

Страница 6: ...For more information please contact us ExpotechUSA 10700 Rockley Road Houston Texas 77099 USA 281 496 0900 voice 281 496 0400 fax E mail sales expotechusa com Website www ExpotechUSA com ...

Отзывы:

Похожие инструкции для 200