5.
Start-up and configuration
5.1 General
It is important to follow all steps in this manual when first starting up.
It is especially important to make sure that the heat exchanger is filled with water and vented before operating. At first,
the complete heating system (pumps, mixing valves, regulation etc.) must be up and running.
5.2 System test
Warning
Do not operate the CHRP-S heat exchanger unless it is installed correctly and filled with water.
Otherwise, burns hazard could arise by contact with hot parts and damage can be inflicted to
the plate heat exchanger.
y
Connect the heat supply and the ventilating system
y
Fill the complete heating system with the heat exchanger
y
Activate the circulating pump (not included in the
exodraft
-delivery) and make sure that it works correctly.
5.3 Testing the security system
Warning
You must test to ensure that the safety thermostat disables the burner if the temperature rises too
high.
To avoid heat damaging the plate heat exchanger, make sure that enough water constantly flows through it.
3002691 CHRP-S UK
Start up and configuration •
13
Содержание CHRP-S
Страница 1: ...UK Waste heat exchanger CHRP S Read and save these instructions ...
Страница 17: ...3002691 CHRP S UK 17 ...
Страница 18: ...3002691 CHRP S UK 18 ...
Страница 19: ...3002691 CHRP S UK 19 ...