Operation
g007027
Figure 17
1.
Dimple
24.
Set the deck in lowest cutting position.
25.
Slide the lower tube onto the blower and attach
the latches. (Make sure that the upper tube does
not move out of alignment).
26.
If the lower tube is replaced, drill three 7/32 inch
holes in the lower tube using the upper tube holes
as reference. See Figure 18.
27.
Remove the tubes from unit and assemble the
upper and the lower tubes using three #10-24
x 3/4 inch hex washer head screws, three #10
washers, and three #10-24 nyloc nuts. The screw
head should be installed to the inside of the
tube to provide minimum obstruction to flow.
Make sure that the upper and the lower ends are
oriented properly as the tubes are assembled.
(Parting lines should roughly be lined up.)
g007028
Figure 18
1.
Drill the holes here
28.
Slide the lower end of the tube assembly over the
blower outlet and align the notch with the tube
latch. Latch the tube to the blower.
29.
Install the removable weights. Hook the front toe
board weight assembly over the top of the weight
mounting plate and secure with two hairpins
Figure 19).
Important:
For correct traction and
stability, install the required quantity of
counterbalance weight(s) as specified in
the UltraVac Operator’s manual, setup
instructions, and/or completing kit.
Weight Quantities-Gasoline Units
Deck
Size
48 inch
52 inch
60 inch
72 inch
Toe
Board
Weight
3
2
2
1
Caster
Weight
—
—
2
2
Weight Quantities-Propane Units
Deck Size
60 inch
Toe Board Weight
3*
Caster Weight
2
*Three total toe board weights = two factory
installed weights without decals, plus one weight
with decal from the UltraVac kit. Refer to the
16