Test Results
Power Blazer
485
Summary (EtherSAM)
Summary (EtherSAM)
From the
Test
menu, tap
Results
, and the
Summary
tab.
Note:
For
Dual Test Set
, only Start Time is displayed on the remote module.
Service Configuration/Performance Test Status
indicates the actual
test status as follows:
Start Time
indicates the date and time the test was started. The date
and time is reset every time the test is restarted.
Remote unit in use and locked for Dual Test Set
indicates that this
module is used for
Dual Test Set
as the remote module.
Test Status
Description
“--”
Test has not started.
Disabled
Test/subtests is/are disabled.
Running
Test/subtest is currently running.
Data Transfer
Test/subtest is running but no test traffic is being transmitted.
Completed
, <Verdict> Test/subtest has completed with the test pass/fail verdict. A
fail verdict is declared when a
Link Down
or
LOS
is detected,
or when any SLA parameter fails.
Aborted
,
<
reason
>
Test/subtest has been aborted either manually (Stop) or
automatically from an alarm and the reason why the test has
been aborted is also displayed as follows:
Link down alarm
,
LOS alarm
,
Timeout during execution
,
DTS connection failed
,
Loss of remote connection (DTS)
,
LOPPS-L Alarm
a
,
LOPPS-R Alarm
LOPPS-L / LOPPS-R Alarm
,
Unresolved addresses
,
No test enabled
,
Invalid Burst Configuration
,
CIR disabled for all services
,
Excessive Refill Time
b
,
Stopped
,
NAT detection failed
,
Missing DTS-NAT SW option
a.
Available for
Dual Test Set
in
One-Way Latency
measurement mode.
b.
An excessive refill occurs when the pre-burst and/or post-burst duration last for
more than 2 seconds.
Содержание Power Blazer 88000 Series
Страница 1: ...User Guide 88000 Series Power Blazer HIGH SPEED MULTISERVICE TEST MODULE ...
Страница 12: ......
Страница 16: ......
Страница 22: ......
Страница 28: ......
Страница 38: ......
Страница 58: ...Test Setup Test Applications 46 88000 Series OTN BERT ...
Страница 64: ...Test Setup Test Applications 52 88000 Series SONET SDH BERT For SDH BERT ...
Страница 69: ...Test Setup Test Applications Power Blazer 57 SONET SDH DSn PDH BERT For SDH ...
Страница 550: ......
Страница 670: ......
Страница 674: ......
Страница 686: ......
Страница 707: ...Glossary Power Blazer 695 10G Ethernet Client The following figure presents a typical network application ...
Страница 721: ...Glossary Power Blazer 709 Ethernet Cables Straight Through Cable 1000 Mbit s Crossover Cable 1000 Mbit s ...
Страница 765: ...Glossary Power Blazer 753 SONET DSn SDH PDH The GUI Grid indicates the TUG 2 x and TUG 3 x values ...