Test Setup - Test Configurator, Timer, and System
158
FTB-700G/800 Series
Interface (iSAM)
Interface (iSAM)
From the
Test
menu, tap
Setup
,
Test Configurator
, and the
More
button
from the
Local
block.
LINK
An arrow is used to indicate the status of the test link.
A green arrow indicates that the link is up.
A red arrow indicates that the link is down.
A gray arrow indicates awaiting incoming data to provide a status.
Interface/Rate
or
Port
choices depend on the rates available on the
module.
For 10GE WAN, the test uses the WIS default values for J0, J1, and C2 as
defined in
Interface/Rate
10GE WAN
10GE LAN
1GE Optical
100M Optical
10/100/1000M Electrical
Содержание FTB-1
Страница 1: ...User Guide FTB 700G 800 Series NetBlazer for FTB 1 ETHERNET AND MULTISERVICE TESTER...
Страница 12: ......
Страница 20: ......
Страница 22: ......
Страница 52: ......
Страница 59: ...Test Setup Test Applications NetBlazer 47 SONET SDH BERT For SDH BERT...
Страница 64: ...Test Setup Test Applications 52 FTB 700G 800 Series SONET SDH DSn PDH BERT For SDH...
Страница 84: ......
Страница 98: ......
Страница 298: ......
Страница 574: ......
Страница 604: ...Glossary 592 FTB 700G 800 Series Acronym List W WAN Wide Area Network WIS WAN Interface Sublayer WWN World Wide Name...
Страница 606: ...Glossary 594 FTB 700G 800 Series 10G Ethernet Client The following figure presents a typical network application...
Страница 619: ...Glossary NetBlazer 607 Ethernet Cables Straight Through Cable 1000 Mbit s Crossover Cable 1000 Mbit s...
Страница 646: ...Glossary 634 FTB 700G 800 Series SONET DSn SDH PDH The GUI Grid indicates the TUG 2 x and TUG 3 x values...
Страница 652: ......
Страница 674: ...0 5 1 5 48 5 0 176 W d y K y K D...